Comparison of construction performance description! What should we prefer?

  • Erstellt am 2014-02-03 15:16:54

Bauexperte

2014-02-18 11:19:56
  • #1
Hello,


That means if the soil report shows different soil classes, it will get expensive because a.) a soil replacement must be carried out and b.) the excavation material must be disposed of expensively => topic additional foundation costs!


Sure or assumption? This is included in the scope of services in few construction descriptions (BB); actually "only" in pure developer measures.


If and only if the excavation is suitable for this.


What does that mean?


Doesn’t exactly sound great ... our slabs are 20+ thick; depending on structural requirements


In no case advisable! You are the owner and the master of your own fortune – that means you are liable accordingly for negligent foundation work!

Where you – apparently – have such a fear of the topic house construction, why don’t you get external help?

Rhineland regards
 

kochones

2014-02-18 11:48:13
  • #2


No .... as said, I will definitely hire an expert who will inspect the property
 

kochones

2014-02-24 23:25:39
  • #3
So, another week has passed. But overall, a bit wiser. The offer from the BU stands with a plus or minus 3% deviation. At least that's what he says.

So we have an offer for a 120 sqm 1.5-story single-family house in Kfw 70 standard with an air heat pump for 270,000€, but we don't know what it should look like or how big the terrace will be.... no idea. Without a planning contract, we won't get any planning or sketches made. The BU says he will just try to stick to the price. All in all, according to him, it can be at most 3% more expensive. We would agree to that, but we would like to know..... roughly how it will look.

So I have to bother again etc. For now, I have an appointment with another BU who has been locally established here for a while, where I want to get another offer. Let's see where we end up with him, because he has almost the same craftsmen on hand. We'll see.

So far, my favorites are: 1. the aforementioned BU with the 270,000€, 2. House of the craftsmen with 250,000€ + ancillary building costs, so I also calculate about 270,000€ here, 4. Was Stadt & Land...... but that was a quick rejection because they are no longer up to date. The next appointment is on Wednesday... with the other BU... let's call him BU2 here.

I'll get back to you.
 

C.Karlo

2014-02-25 23:42:00
  • #4
Hello Kochones,
it is best to have the tender prepared by an architect. This architect must refer to an experienced structural engineer. This way you get roughly the same information and offers on this basis. Everything else carries a very high risk of being cheated by every company. The money spent on a professional tender is quickly saved later during the quantity settlement. It is very important that there are no unit prices (EP) in the tender, and if there are, have them crossed out and reconfirmed. I have learned from these mistakes. Architect and shell construction company are friends. No chance in court. Many execution errors simply are not remedied afterwards. You never know who is working with whom. Usually, shares of the collected amount flow in the background. And everything is justified by stating that the DIN standard is met. The basic rule is: do not hire any company recommended by the architect! Visit reference houses yourself on the slope to be convinced.
Good luck.
C. Karlo
 

schubert79

2014-03-11 18:37:37
  • #5
But you also have to stay calm.... at the moment there is quite a lot going on in construction. And you will always get different prices. And the offers are not that far apart. 280 TEU to 310 TEU. Additional costs and fees are of course extra...
 

kochones

2014-03-11 22:57:03
  • #6


That's exactly it....

Developer A says 280K€ all in....

Only one architect says 310 and another 37 for his fee

I have an appointment with another architect on Friday......let's see.....I was there today but he had no time.
 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
16.04.2014Cost of soil survey - Does the architect pay or do we?12
16.09.2014Termination of collaboration with architect - demands excessive fee28
01.10.2014Collaboration with an architect - how does it work properly?22
25.02.2015Planning / Architect, involvement of specialist planners for the approval plan10
10.04.2015Cost estimate architect single-family house. Your assessment44
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
27.12.2015Who has built with an architect? Experiences??85
11.09.2015Building a garage on the boundary is not possible according to the architect.11
17.11.2015Is an architect really that expensive?46
05.04.2020Developer or architect - costs43
07.03.2016Various dimensions architect execution drawing12
23.09.2016Architect and budget limit... insurance? possibilities25
17.04.2017Civil Engineer vs. Architect17
13.06.2017Architect or developer? Which is more affordable?13
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
10.11.2017House plan by architect 2 floors with basement18

Oben