2023-06-12 19:01:10
- #1
Here we go! After months of struggling with the city over the building permit, there is now apparently a partial building permit for the basement, and the groundworks have started! Hurray! Allegedly, the proper building permit is supposed to come this week as well, but well, the city has already promised that a few times in a similar way (but the weeks were surprisingly short), so I won’t believe it until I see it. However, we don’t have to pay anything until the full building permit is there.
Otherwise, the window costs us an arm and a leg, but apparently it will get an electric roller shutter like all the other windows, and the extra door + hallway planning will cost another three toes on top. (Total for both ~3.5k) But that’s how we’re doing it now. It also reinforces that we probably won’t make many other adjustments. The TV will probably get some “we’ll figure it out somehow” solution.
On the other hand, we were informed that we will probably get the photovoltaic preparation for free. It’s only “just” cables from the basement to under the roof, but still.
Otherwise, the window costs us an arm and a leg, but apparently it will get an electric roller shutter like all the other windows, and the extra door + hallway planning will cost another three toes on top. (Total for both ~3.5k) But that’s how we’re doing it now. It also reinforces that we probably won’t make many other adjustments. The TV will probably get some “we’ll figure it out somehow” solution.
On the other hand, we were informed that we will probably get the photovoltaic preparation for free. It’s only “just” cables from the basement to under the roof, but still.