When estimating optimistically, it's better to add a flat 20% buffer... With me, we hadn't considered several things at all - base renovation, demolition of an unauthorized part of the floor slab, core drillings through the concrete ceiling inside the house for the cables and through the floor slab outside for the house connections, counter battens for drywall in the attic by the carpenter... The insulation of the floor was not included in the sanitary estimate... Especially in a renovation, some things might only become apparent during the process, or you might still want to add a little extra... For example, I had an additional skylight installed. Each item on its own manageable, but in the end the thousands add up...So far, the estimate seems to be conservative enough. An offer for the ETICS facade is, for example, around €10k. However, I also interpret that as an optimistic figure.