Purchase opportunity for an old building from 1953, assistance with evaluation

  • Erstellt am 2022-12-21 12:57:22

Kiefernadel

2022-12-22 20:33:40
  • #1
Here I obviously expressed myself clumsily. That was a thought experiment about how we best use the money and the loan. Because in the end, running to the bank with a bill for every little thing to get the money paid out seems very tedious to me. Especially when you want to do a lot yourself. But maybe it doesn't work like that at all. The bank can then give us more clarity. And especially the things for which there might be funding are very expensive and we would have done them (windows + heating). As I said, that wasn’t fully thought through yet :).
 

ypg

2022-12-22 23:30:44
  • #2
Ooh, is that the access road? I would plan that differently too.
 

Joedreck

2022-12-23 06:11:18
  • #3
Starting next year, [EL] is supposed to be eligible for funding again?

Regarding [EL]: I have also renovated two houses in [EL] on my own and am professionally far from the field. If you can save anywhere, it’s on the unpleasant time-consuming tasks like chiseling, demolition, etc. That takes time and money.
 

Grundaus

2022-12-23 11:14:45
  • #4


My parents' house was built in 1954, after the previous building was no longer salvageable. No building application was even submitted back then, and when someone from the office came by, the bricklayer drew something during his lunch break after a few beers. The exact survey took place partially decades later when a sidewalk was built or the neighboring plot was divided.
 

Reinhard84.2

2022-12-25 09:17:43
  • #5
Huge living space, good property, not too expensive, on dad’s dime.. - free after Bobby Habeck: what was the question?;)
 

xMisterDx

2022-12-25 09:41:12
  • #6


As a layman, you believe that the chipping work is enormously time-consuming.
Because the layman approaches the slots just with an angle grinder, whereas the professional comes at least with a double angle grinder, but usually with a milling machine.

My electrical rough installation was finished within 2 days, I couldn’t even watch that fast. The slots are a matter of one day for an electrician. At an hourly rate of 60 EUR you save about 600 EUR.
The layman flails around at least a weekend with three people in the house for that, more likely longer.

From that, the layman must deduct the costs for tools and the time.

Laying the cables itself continues. Whoever does not do this regularly will only get a crossover switch done with a lot of thinking so that it also works.
The electrician buys cable much cheaper than the layman at Obi. Etc.
 

Similar topics
16.07.2015Cable for outdoor lamp too short11
01.01.2016Cost of house connection for Kabel Deutschland and Telekom?37
18.11.2016Electrician's invoice after 2.5 years - What are my rights?18
14.01.2018Kabel Deutschland or Telekom or both14
12.05.2017Is an advance payment to an electrician lawful?23
01.08.2019Trouble with the electrician / tolerance range?!42
20.02.2020What does the electrician do during the shell construction phase?19
04.02.2020Installation of additional insulation for underfloor heating - cables lie on the raw floor slab25
07.09.2021Wi-Fi New Construction - Network Sockets/Cables53
23.03.2020Building law: Electrician refuses to continue78
06.06.2020Pull the cable through the conduit20
01.09.2020Which conduit for LAN cable?32
18.09.2020CAT cable in the utility room - not crimped?45
21.07.2021Problem with the electrician - what would you do?78
08.05.2021Connecting LED ceiling lamp - several cables hanging from the ceiling27
04.01.2022How to distribute and connect SAT cable and Ethernet?16
28.11.2022Do you need LAN cables in the garage?107
20.09.20225-pin cable to 3-pin cable13
09.07.2023Electrician Cost Estimate - New Installation22