Hello Peanuts,
thanks for your assessment. That gives me some courage. I also dare to install it myself. Maybe in the end I will get a great bathroom at a good price. Still, I don't really want to do it, because sooner or later I get into conflict with other commitments (work) with such projects.
: The standard elements are not appealing. The parts for the price mentioned are quite a difference, even if the sum is not justified in my opinion. Yes, the contract is signed, the shell is half finished.
Depending on which washbasin (the price for yours is exorbitant), it can be installed in 2-3 hours, a toilet as well, if the element with flush tank is installed. That was part of the pre-installation done by the company for us.
Aligning the bathtub with drain and all is a bit fiddly, but you can take your time for that.
Installing the fittings was no problem at all with good old hemp!!!
Just don't use some modern tape, because if you unscrew a little bit again, the connection leaks.
BTW, our standard was indeed from Villeroy & Boch, but rather the cheaper series (Omnia).
We wanted to upgrade to Subway then, which would have cost at least 5000.- extra. With bathroom furniture they wanted about 13000.-, I think, on the internet we paid between 7-8k.