RotorMotor
2021-01-29 16:31:49
- #1
So that would be 7 K instead of 2 K.
Yeah okay, of course you could calculate it that way, although I wouldn’t know exactly what the mentioned components cost.
That should fit better, but then you have no light switches. :D
Yeah, that’s the point of the exercise, right?
It naturally also depends a bit on the level of equipment, but assume for example that network sockets (duplex) cost around 200 EUR each. You quickly have ten together, which already uses up the 2 K by itself.
Basically correct, but for me the network point is already independent of KNX.
I would have taken network sockets even with "standard" electrics.
Maybe it’s two more now for visualization and distributor connection, but that doesn’t make much difference.
Where is the construction site?
At least 3 separately switchable circuits per room to the distributor. Which are initially laid on terminal blocks and all sockets are initially on continuous power. Later you can rewire as needed.
And of course bus cable in every corner and everywhere you could somehow imagine sensors or actuators (plan so that an expansion would still be possible in 10 years). Don’t forget empty boxes. Laying the bus cable in addition to NYM is really no effort and practically cost-neutral.
In OWL.
Yes, that is on the wish list so far. But I still have to make it more concrete, i.e. where empty boxes and so on should go.
A friend just told his electrician to lay empty conduits and so on properly for future flexibility.
Although it was approved, in the end there was nothing extra. ;-)