erazorlll

2020-06-23 11:11:58
  • #1


Not at all, please feel free to continue the discussion. Although this isn't the flooring thread here, your discussion is valuable for my decision.

But I'll bring up another point again:
A few pages earlier, we discussed an open ridge in the upper floor. Meanwhile, we're considering installing a ceiling in the upper floor, which should then be a bit higher (possibly around 2.80m or so). However, then we have the problem that we could no longer install a skylight in the hallway or only with a strong tunnel upwards.

Now GU installed the Velux light tunnel and I read some information about the competitor product Solatube in other forums. What I gathered was: it works, it brings in light, Velux product apparently repeatedly has condensation problems, Solatube apparently significantly brighter because of the different construction on the roof.

Does anyone have experience or an opinion on this?
 

i_b_n_a_n

2021-06-06 13:20:53
  • #2
A year has now passed, what does the current construction progress look like - or have you already moved in?
 

driver55

2021-06-06 14:23:05
  • #3
I’ll take the liberty and provide the progress. (Info from yesterday)


 

ypg

2021-06-06 16:27:08
  • #4
"Identical" to what? (And two words)
 

driver55

2021-06-06 17:08:55
  • #5
You just have to click the link in #57... ;) It concerns "Hauswirtschaftsraum Raum ohne Fenster"
 

erazorlll

2021-06-06 20:40:03
  • #6


Thank you for asking. We would like to live in the house already, but unfortunately everything is dragging on extremely.

Here’s a brief chronology:
August 2020 – Building application submitted
February 2021 – Building permit received (yes – almost 6 months later and that in beautiful Baden-Württemberg with a legal deadline of 3 months)
March 2021 – Start of detailed planning
June 2021 – hopefully start of construction

At first, the building authority took a lot of time and twice requested documents or changes from us. We had expected a permit within 3 months but had to wait twice as long.
Then, shortly before our building permit was issued, the contractor had already received approval for several other projects, resulting in a lot of work at the same time. For this reason, the detailed planning took over 3 months.

There was a change from the building permit compared to the building application that had to be followed up on (with a few technical challenges) and the entire sewage planning was not that simple either because all the bathrooms etc. are not stacked above each other. In addition, a few changes occurred to us in the last 6 months that we wanted to have changed. So we have now also decided at short notice on a laundry chute.

The planning is currently with the structural engineer, electrician, and plumber. We hope to get feedback within the next 1-2 weeks and then slowly be able to start.
I was aware that all this takes time but after more than a year I am now slowly getting impatient.

As soon as the plans are back and final, I will gladly post them here. We have made a few changes compared to the planning in the first post here.
 

Similar topics
31.10.2008Is a building permit also required for a carport and equipment shed?13
15.02.2011Building permit application12
27.09.2018Cost of building permit in exemption procedure, new construction11
15.06.2015Garage - Building Application - Confusion36
28.11.2024Neighbor's lawsuit against approved building permit46
16.01.2017No building permit as long as the land is not developed?10
04.08.2017Building application or building notification15
20.11.2020Wait with the building application because of the child construction allowance1354
11.05.2018Construction application costs only 40 euros due to exemption application?27
14.10.2018Building application - delay due to neighbor's lawsuit - experiences?21
04.01.2019Terrain modeling different from the building application - allowed? (NRW)36
25.11.2019Exemption procedure or building permit40
07.11.2020Floor plan optimization for a semi-detached house of 150-160m² on a 360m² plot in a new development area95
15.08.2021Duration until the issuance of the building permit in BW57
30.07.2021Is building without a building permit possible?26
30.11.2021Fee notice for building application57
22.05.2022Tips for Waiting for Building Permit26
28.06.2024Building permit - is a lawyer useful?12

Oben