What exactly are you missing in the additional costs? No extra items are listed in house construction. I can understand the objections regarding the kitchen and furniture. We would take it easy with the furniture at the beginning (I know, that is always easier said than done). For the outdoor facilities, our calculation is as follows: If we start building in 04/05 2021, we can move in during winter 21/22. Then in spring 2022, we would only do the lawn and possibly a hedge along the street. Carport to be built independently.
 

nordanney

2020-11-23 09:06:56
  • #2

Interest is always due immediately from the first disbursement. The start of repayment can be freely agreed upon (well, somewhat freely – the bank does want you to repay at some point). Normally, repayment starts in the month following full disbursement.

At that time, I wouldn't give you a loan ;-)
 

OWLer

2020-11-23 09:12:48
  • #3


The earthworks are too cheap compared to the standard, especially with a basement. We pay nearly 15k for the best sand. Soil survey costs at least 800€, including the determination of the Z-value for disposal. These topics are usually not included in the general contractor's offer because of the risks from the soil survey.

My 15k earthworks for the basement are already very cheap!

Regarding photovoltaic, please don't expect it to be cheaper. The solar technician's son coached my wife, and he couldn't offer us more than 1000€ net per kWp. Gross was not under 12k. I would rather add another 1000€ to the calculation.



Construction electricity, earthworks, surveys, construction site fence, disposal/refilling of the soil - if all this is included in the general contractor's construction performance description, perfect. I would be surprised.
 

ypg

2020-11-23 09:31:11
  • #4
hm...

That is too little budgeted for paving by a landscaping contractor.
I also find earthworks and this and that too little. But the gentleman may calculate differently than I understand ;)

To me as well. I find it odd that apparently the basement is a utility basement, but equipped with venetian blinds and corner windows. If the basement is built within the thermal envelope, it will cost more.
Why even a basement? Is this a hillside property? With 800sqm I would rather build 10–15sqm larger to have 20sqm more actual living space.
I would also forgo KfW 40+. You have to calculate how much of the subsidy is left. You don’t really save much energy anymore with the Plus.
Listen to :)
 

OWLer

2020-11-23 09:57:05
  • #5
Additional question: Filling, sanding, wallpapering, painting? Floors, such as parquet in living/bedrooms? If turnkey really only means placing furniture in the house, then everything is fine - but today that is a real exception.
 

Ysop***

2020-11-23 10:05:19
  • #6
The others have wonderfully added. In summary, I would assume that you probably won't come off cheaper if that was the hope. Rather, there are indications for more expensive construction if you stick to your program.
 

Similar topics
09.06.2013Costs of earthworks without basement15
15.01.2013Soil survey report for house construction10
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
22.08.2013Are the estimated costs of the general contractor for earthworks reasonable?12
24.07.2014Soil assessment report, filling - additional costs?11
03.10.2014Planning the dream house after shocking calculation38
04.03.2015Budget plot and building with basement21
20.11.2015Single-family house with a small footprint, attic and basement, neighbor's approval31
06.10.2015Correct formulation for a waterproof basement11
24.08.2021Slope position, basement open at the front, bathtub31
01.02.2017Basement originally partially concrete, now possibly completely brick-built28
27.03.2017Approximate costs for earth excavation based on soil investigation14
28.07.2017Calculation / Additional Costs Expansion House28
19.08.2017Construction costs in BW for a single-family house with a 200m2 basement and double garage38
26.03.2018Is a soil report not possible before surveying the new construction area?16
30.04.2018New construction - Is it advisable to lay basement tiles immediately? (Moisture)14
28.03.2019Does my budget fit the construction project?23
08.04.2019Earthworks costs in Bavaria15
12.07.2019Construction costs for a new 150m2 building without a basement in South Baden-Württemberg16
15.07.2020Soil survey even if I don't build a basement?13

Oben