That's hard for me to say, there is always only one position for additional excavation and extra material, whereby part of it is always for the garage and part for the continuation of the shafts, etc., and then part is extra effort compared to the construction performance description. The slope at our place is also rather low with about 0.80m height difference along the length of the house. However, we also had a very "friendly" soil report, which essentially said: "Remove topsoil, then just scrape off the loose stuff, that's enough." There are also soil reports where you first have to excavate 1.20m deep, regardless of how high the house is planned.