we are planning to build a single-family house with 130 sqm in southern Lower Saxony in a rural area. We already own the plot of land. How much do we have to expect for turnkey construction costs?

Further information:

-without basement
-1.5 stories
-gable roof, 22-degree pitch
-guest bathroom with shower
-underfloor heating
-1 dormer
-170 sqm total area
-without garage
-40 sqm terrace

We would appreciate corresponding answers. Thank you!
 

Bauexperte

2016-10-03 16:40:33
  • #2
Good day,


Assuming that you want to build solidly and further assuming that it is a dormer with a width of 1.50 m (and not a cross gable), the construction should cost you about EUR 250,000 for 170 sq m. Plus costs for painting/flooring work, incidental construction costs, reserve extras, and costs for outdoor facilities.


From €60.00/sq m upwards; depending on the type of terrace.

Rhenish regards
 

lars-steina

2016-10-03 16:53:43
  • #3
Thank you construction expert for the quick reply. In various forum reports, I have always read a value per sqm of living space of €1,600 - €1,700. In your calculation, it would be approx. €1,900. Where does the difference come from? Possibly from the value-added tax. Because €1,600 net + 19% value-added tax would be about €300 = €1,900, which fits quite well.
 

V3ctra

2016-10-03 18:12:25
  • #4
Hi, I have a current offer for our house here. It is a [Zwerchgiebelhaus Massiv] with 150 sqm of living space + basement. Knee wall 125 cm, air-water heat pump including [Fertiggarage] etc. Turnkey cost: €302,800... The house is to be built in Bavaria. Regards
 

tomtom79

2016-10-03 20:34:11
  • #5


What kind of VAT?

250k :170k = approx. €1,490 so it fits after all

without ancillary construction costs, right? And the €300k were current 2-3 years ago, now it will be difficult or very low quality.
 

V3ctra

2016-10-03 21:01:47
  • #6
Yes, without additional construction costs. But including construction electricity and water and connection of the drainage system (separate system). The equipment is standard. So no golden faucets or similar now. The offer is dated 30.09.2016.
 

Similar topics
08.12.2015Construction costs for KFW70 house with basement turnkey15
18.10.2012Ancillary construction costs and general expenses for a new semi-detached house14
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
11.10.2022List of incidental construction costs. More expensive "on the builder's side"?154
30.09.2014New construction planning - single-family house 160 sqm without basement - floor plan, costs, etc..29
04.03.2015Budget plot and building with basement21
09.04.2015Sacrifice the basement for 20m² more living space?15
13.03.2018Turnkey Construction Land and Prices79
26.04.2016Estimation of construction costs (and ancillary construction costs)11
23.06.2016Additional construction costs ... but which ones?39
22.03.2019Construction costs 200m² + 30m² roof terrace + basement (including garage)20
17.10.2017Construction costs for a single-family house 190m² + basement including a granny flat28
05.10.2017Cost of a single-family house 180m2 with basement and double garage14
22.12.2017Construction costs for a single-family house with a basement in NRW84
24.02.2018Construction costs of a single-family house with a basement and double garage29
18.05.2018Single-family house with >180 sqm / basement / garage68
28.08.2019Building a single-family house with a basement - Is the financing calculation too risky?64
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
07.08.2020Single-family house - Bavaria 150m² including basement, terrace - cost breakdown11

Oben