Reggert
2021-06-07 22:30:05
- #1
Hello forum!
We have received a construction performance description of our current favorite house build that we consider relatively detailed from our layperson's perspective and wanted to ask if, according to the forum's opinion, there are still points that are insufficiently discussed / not "normal" or simply should be explained in more detail.
I am sorry for the many photos, I hope I did it correctly like this!
To give a small introduction: We are planning a 100m2 bungalow "turnkey," meaning without painting work and floor coverings; additionally, we will do the tiling work and connection of the sanitary fixtures ourselves. We are also taking care of the exterior facilities on our own. If more information is needed or if I forgot something, please correct me, then I will try to provide it! :)
I think I will introduce our project soon, once reliable figures are available and we are basically "ready to sign," shortly before the final bank appointment.
BTW the forum is VERY helpful, great praise :)

We have received a construction performance description of our current favorite house build that we consider relatively detailed from our layperson's perspective and wanted to ask if, according to the forum's opinion, there are still points that are insufficiently discussed / not "normal" or simply should be explained in more detail.
I am sorry for the many photos, I hope I did it correctly like this!
To give a small introduction: We are planning a 100m2 bungalow "turnkey," meaning without painting work and floor coverings; additionally, we will do the tiling work and connection of the sanitary fixtures ourselves. We are also taking care of the exterior facilities on our own. If more information is needed or if I forgot something, please correct me, then I will try to provide it! :)
I think I will introduce our project soon, once reliable figures are available and we are basically "ready to sign," shortly before the final bank appointment.
BTW the forum is VERY helpful, great praise :)