Well, one should consider why the step is there. What do you want for the new shower, as little slope as possible or? It could be that drains etc. are currently located almost above the finished floor level and that's why the idea is to remove everything, including screed and underfloor heating, to completely rebuild it and at the same time integrate drains into the underfloor heating level, making it more flexible towards a level-access shower.