Knallkörper
2017-01-21 11:50:49
- #1
In our construction area, the entire ETICS on one house was torn off again because it was not fully glued over the entire surface. There are also plenty of potential sources of errors with the facing shell, especially the base sealing at floor-to-ceiling windows or exits, which I often notice negatively and was only correctly executed in our case after several requests.
When the interior plaster was done at our place, it was cold outside, below zero degrees. Inside, the heating was turned up strongly to 25 degrees. Water drained out at several points from the drainage joints to the outside. Overall, the building dried very well, most of the water was of course ventilated out.
When the interior plaster was done at our place, it was cold outside, below zero degrees. Inside, the heating was turned up strongly to 25 degrees. Water drained out at several points from the drainage joints to the outside. Overall, the building dried very well, most of the water was of course ventilated out.