Single-family house on a slope with a basement for 2 people including home office and hobby rooms

  • Erstellt am 2020-04-15 07:48:31

Climbee

2020-04-17 12:24:00
  • #1
And describe exactly what you want. So be honest:

A playroom for different possibilities is simply not a dominatrix studio – the requirements are a bit different, I think.

With the specification "bouldering room," an architect will have less to start with. So specify exactly: closed room, soundwise so many square meters of bouldering area minimum and slopes necessary (because you have to think right away about how to integrate them as well as possible), how high the crash pad is that you will have on the floor, etc. That is very specific; if you want it to be exactly as you imagine, then precise information is needed.

Regarding the kitchen being open or closed, the architect has enough knowledge, but for such a special request, you really have to specify.
 

11ant

2020-04-17 13:44:34
  • #2

Where did you actually get the forum name from – did you climb before you "switched" to bouldering?
 

Climbee

2020-04-17 14:55:37
  • #3
I have always been more of a climber, but unfortunately not for a few years now due to health reasons. However, I hope I can start again sometime. Bouldering was always too strength-intensive for me; I prefer to snake my way up. Chimney climbing, friction climbing, stemming, twisting in - more my world than a long overhang. And I am more of a rock climber than a gym climber. Although the gym is simply good for staying consistent. Quickly heading to the mountain in the evening - that just doesn't work. Quickly into the gym - that does!
 

Chris2511

2020-04-17 15:44:48
  • #4
Funny, exactly at the moment I am reading the post and sitting in the garden, the song "Iko Iko" is playing on my playlist - from the opening scene of Mission Impossible 2, when Tom Cruise climbs up the canyon so "professionally"...
 

Climbee

2020-04-17 15:56:40
  • #5
I once watched a movie with Tom Cruise (if I’m not mistaken, it was Little Tommy), it was about a tight-knit group who engaged in illegal sword or foil fights, often with deadly outcomes. At that time, I was an active fencer and we often watched it after training to laugh ourselves to the floor because the fencing scenes were so bad that it was funny again.

If Mission Impossible 2’s climbing scenes are the same, maybe I should watch it for fun sometime (otherwise, I absolutely can’t get into such movies and Tom Cruise even less so).
 

Chris2511

2020-04-17 16:26:38
  • #6
The climbing scene is just as bad
 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
16.04.2014Cost of soil survey - Does the architect pay or do we?12
16.09.2014Termination of collaboration with architect - demands excessive fee28
01.10.2014Collaboration with an architect - how does it work properly?22
25.02.2015Planning / Architect, involvement of specialist planners for the approval plan10
10.04.2015Cost estimate architect single-family house. Your assessment44
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
27.12.2015Who has built with an architect? Experiences??85
11.09.2015Building a garage on the boundary is not possible according to the architect.11
17.11.2015Is an architect really that expensive?46
05.04.2020Developer or architect - costs43
07.03.2016Various dimensions architect execution drawing12
23.09.2016Architect and budget limit... insurance? possibilities25
17.04.2017Civil Engineer vs. Architect17
13.06.2017Architect or developer? Which is more affordable?13
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
10.11.2017House plan by architect 2 floors with basement18

Oben