Thank you for your answers. Since I am building through a single contract, I do not have a [BU] who plans this for me. The architect did draw it in, but I am not sure if that was really sensible. I thought a second or third opinion couldn't hurt. Roughly, one can say that the riser shaft will be at the bottom left and the water pipes will run at the top right. Maybe someone will still be interested in trying. Regards
 

11ant

2019-03-26 23:02:50
  • #2
... which we cannot see. The architect is the one who plans.
 

red-ed

2019-03-28 20:02:15
  • #3

Very nice of you to keep pointing that out to me. But no, the architect does not do that for me, he only makes the drawings up to the building permit.
I would be glad if the thread contained more useful answers and not answers that are supposed to show me that, in your opinion, I have chosen the wrong way to build.
 

Nordlys

2019-03-28 20:26:02
  • #4
If you don't have an architect or site manager and you yourself are too clueless, I recommend the following procedure. First, take your plan to the electrician, there are very strict regulations on how a fuse box must be hung and how much free space must be in front of it in case someone gets a shock and falls backward. Then you go to the plumber or heating engineer, who will then add his stuff. Then you see if it’s sufficient. My experiences don’t help, our utility room is 12 sqm and we have a gas boiler, which takes up much less space than [Lwwp]. So for us, it’s quite spacious. K.
 

red-ed

2019-03-28 22:26:57
  • #5
Thank you very much, that's roughly how I imagined it. I was told that with 10 sqm I would have enough space to fit everything in. Even a washing machine should fit in there. But now we have a separate room for that, so I think it should fit easily. I thought maybe someone could help me. What do you think about it? I just don't like that all the cables for power and KNX have to run across the entire room to the riser shaft. Maybe you can rearrange that better. The riser shaft is marked in red.
 

ypg

2019-03-28 23:48:35
  • #6


That is why you have a professional plan something like this (house and technology), so that everything makes sense.
Why should someone here make a bold claim to you, only for the professional to implement it differently?
 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
16.04.2014Cost of soil survey - Does the architect pay or do we?12
16.09.2014Termination of collaboration with architect - demands excessive fee28
01.10.2014Collaboration with an architect - how does it work properly?22
25.02.2015Planning / Architect, involvement of specialist planners for the approval plan10
10.04.2015Cost estimate architect single-family house. Your assessment44
26.04.2015Semi-detached house architect or general contractor / prefabricated house or solid construction13
27.12.2015Who has built with an architect? Experiences??85
11.09.2015Building a garage on the boundary is not possible according to the architect.11
17.11.2015Is an architect really that expensive?46
05.04.2020Developer or architect - costs43
07.03.2016Various dimensions architect execution drawing12
23.09.2016Architect and budget limit... insurance? possibilities25
17.04.2017Civil Engineer vs. Architect17
13.06.2017Architect or developer? Which is more affordable?13
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
10.11.2017House plan by architect 2 floors with basement18

Oben