Zaba12
2019-06-25 20:48:14
- #1
Ok so then let’s get started!
- Federal state?
- General contractor, property developer, individual tender
- Condition of the plot? Slope or flat?
- Exact square meter count
- Energy Saving Ordinance standard
- Construction method inside/outside? Brick, ETICS, drywall?
- Central controlled residential ventilation, KNX, fireplace?
- Number of bathrooms / equipment
- Windows / patio doors lift-and-slide door, double-leaf, floor-to-ceiling, size
- Floor coverings? Where what how much?
- Where own work?
- everything else that comes to your mind?
Sorry but I have been involved here for so long that I can very well assess whether I have been ripped off or not.
For the same house plus basement (construction time 8 months) many would have had to pay at least €60k more because connections played a role.
At least I tell it from first hand and not second hand?
What is included in the €4k fixed and finished exterior? Alone my material for paths, driveway and terrace costs €6k And that’s just the slabs and the paving!
- Federal state?
- General contractor, property developer, individual tender
- Condition of the plot? Slope or flat?
- Exact square meter count
- Energy Saving Ordinance standard
- Construction method inside/outside? Brick, ETICS, drywall?
- Central controlled residential ventilation, KNX, fireplace?
- Number of bathrooms / equipment
- Windows / patio doors lift-and-slide door, double-leaf, floor-to-ceiling, size
- Floor coverings? Where what how much?
- Where own work?
- everything else that comes to your mind?
Sorry but I have been involved here for so long that I can very well assess whether I have been ripped off or not.
For the same house plus basement (construction time 8 months) many would have had to pay at least €60k more because connections played a role.
At least I tell it from first hand and not second hand?
What is included in the €4k fixed and finished exterior? Alone my material for paths, driveway and terrace costs €6k And that’s just the slabs and the paving!