I once represented the max. level with SM. With your variant, even with SM much less comes out.
That also works without retaining walls, then simply apply the excavation soil in the south and slope it 1:2 towards the boundaries.
I gave it a try. In principle, the idea is clear, but what would the entrance area look like? It would be quite a steep slope from level CP to the front door. In addition, at the end of CP there is a rather large height difference, which would also have to be compensated with SM. Do you think this would be cheaper than the other variants? Or did I implement something wrong?