HOAI or why architects have no interest.....

  • Erstellt am 2019-02-26 15:41:21

Bau_Bambi

2019-02-27 11:44:51
  • #1
Sorry, forgot the details ;-). Yes, it is actually a detached house, new build about 150 sqm according to KFW40 (presumably). In terms of content, all are comparable; with the 3rd architect, even service phase 5 is included, but in return, the construction supervision by an energy consultant is omitted. Offers 1 and 2 only up to service phase 4. These are actually lump sum prices (wording in the offers). We choose the craftsmen ourselves. We only want the architects until the approval – after that, we take over.
 

caddar

2019-02-27 11:47:01
  • #2
I think you misunderstood that. The architect just wanted €200 for forwarding the relevant plans and data to the geologist. Apparently, nothing has been drilled there yet.
 

face26

2019-02-27 11:47:30
  • #3
Seems to vary a lot by region as well. Around here, an architect wouldn't even give you the time of day for something like that. It's not uncommon for someone to say they won't build for less than budget xy. From what I hear in the area, most architects barely schedule an appointment unless you already have the land secured.
 

Lumpi_LE

2019-02-27 11:49:31
  • #4
1) never signed a contract that is billed by the hour
2) never signed a contract that is billed by the hour
3) look carefully at what is stated as the scope of services in the offer, if there is no [HOAI] contract you cannot refer to what is stated in the [HOAI] regarding the service phases.
 

Bau_Bambi

2019-02-27 11:54:07
  • #5
Actually - okay, then my comment is withdrawn, as it is pointless ;-). What surprises me is the price difference between the architects. We have not accepted any offer yet, since apparently it can be done cheaper. Whether cheap is ultimately good, we will find out through the discussions that take place beforehand.

The services are indeed listed according to the HOAI phases, i.e. planning and cost estimation, design with cost calculation, approval - as it should be. And that for all three. Nothing is listed regarding fees outside the price, so no hourly rates. Understandably, as a layperson, one becomes skeptical when such huge price fluctuations occur despite seemingly identical services.
 

caddar

2019-02-27 12:01:49
  • #6


That could be because the architects each calculated differently how much from existing plans they can incorporate into your planning.

In that regard, I am a complete layperson, but I would then look closely at what is exactly named as the "subject of the contract" and scope in the contract. For example, whether a room program appears there, or already some kind of standard house, etc. Because I somehow cannot imagine a completely free design according to HOAI with 2-3 preliminary drafts and all refinement steps.
 

Similar topics
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
08.09.2015Massive house by the architect, approximate costs?16
12.10.2017Cost of enclosed space. First draft discussed with architects27
16.02.2018Stress with the architect - naively signed the preliminary contract17
11.07.2018Architects / Civil Engineer Service, Execution Plan, Scope26
29.01.2019Responsibility of the architect in case of KfW interest and further matters148
30.11.2018Architect's Fee - Experiences10
04.01.2022Architect, contract according to HOAI 2013 - refuses to provide service36
13.01.2020Cost of house construction with an architect34
11.03.2020Architects invoice - Amount okay?13
26.04.2020Are phases 1-4 sufficient? Or additionally 5?11
01.07.2020Complete offer from the architect? Is the price reasonable?54
25.09.2024Architect search Munich + surrounding area (recommendations?)15
03.02.2021Architect's fee and construction diary14
06.01.2022Architects or prefab house cost calculation and next steps27
22.05.2022Are performance phases 1-3 with the architect and lump sum offer somehow disadvantageous?19
18.01.2023Architect performance phase 1-4 - Which documents are required?33
25.06.2022Is the cost estimation by the architect realistic?39
12.02.2024Preliminary design via the architect and then tendering?16
13.11.2023Catalog house or free planning with architects12

Oben