Is there already a final plan here or even pictures of the construction?
Hello!
The finished floor plan is very similar to the one shown on p. 9. The biggest difference is that the garage had to be moved to the northern boundary. To ensure that the wall area facing the neighbor complies with legal requirements, we had to plan the left side of the garage 1.50 m shorter. However, two cars still fit inside.
Inside, there are a few small changes (e.g., staircase to the attic in a different location; bathrooms have a different layout), but nothing major.
Unfortunately, the construction is progressing very slowly.
The excavator only started in October 2022. At the moment, we are at the point where the foundation slab was poured last week (at temperatures just above freezing...).
Here are three photos from the end of last year.
If you have any specific questions, feel free to contact me again.