Financial realization of a single-family house realistic?

  • Erstellt am 2020-04-13 16:09:56

ECE-2021

2020-06-04 21:07:38
  • #1
I feel for you!

We are in exactly the same situation.

We don’t know much, cannot contribute any input ourselves, sales performance and offer Kh convinced us.

The land contract is being drawn up by the notary.

Only the expert unsettled me because unfortunately he confirmed exactly the things I had previously read online as negative points of the construction method.

For example:
Leaks at window joints/ that the butt joints are not sealed, the above-average long time water remains in the house (>2 years), well, and that it is not particularly ecological.
But he said all this independently of the provider, purely about the construction method (other providers do it too).

Furthermore, it is apparently more difficult to fix heavy things to walls, since you always have to drill through to the concrete with a hammer drill and then need very long screws and anchors.

We are still considering it, but somehow no one was as convincing as KH so far except for the wall.

Now there is also the VAT reduction, you can surely get more off the price if you close within the next 6 months. 3% is certainly not little.
 

Rallyestreifen

2020-06-04 21:24:17
  • #2
Yes, as is well known, having the choice also means having the agony...

After purchasing the plot, we now want to sign the contract with Kern promptly. We want to build the Futura desk with garage. I have to say, I really liked the model house a lot.

May I ask where you want to build and which house? To what extent have you commissioned/consulted an expert in advance?

Regarding the tax reduction, I understand that you only benefit if construction takes place this year. We are only starting at the beginning of next year, so I am not sure, but I think we have to pay 19%.
 

ECE-2021

2020-06-04 22:06:14
  • #3
We want to build in Leipzig, specifically a city villa. Our plan is based on the city villa Karat, but we have completely designed the interior ourselves and have also made some changes to the exterior.

We also have a fairly large construction project with 200m² on 2 floors + basement. We do not yet have a garage included. However, I think his recommendation was to have it built separately. We will inquire about that again.

Do you want to have a double garage built? Do you know how high the cost item for that is at KH?

We will address the issue of VAT.

This week we contacted an expert whom we would like to hire later for construction supervision and asked a few questions directly by phone. He is also supposed to professionally review the construction contract + construction description. As a layperson, it’s easy to overlook something.
 

Piotr1981

2020-06-05 06:55:19
  • #4
The decisive factor for the tax is the day the invoice is issued. However, if you only start next year, then that will not play a big role.

Best regards
 

Rallyestreifen

2020-06-05 06:58:45
  • #5
Hi,

yes, we want a double garage, 6 * 6 meters, with a frame, it should look like this (but in different colors):



Kern quotes the garage itself at about 26,000 EUR (through a subcontractor), the frame will be built by ourselves and costs 7,000 EUR.

I will also address the issue of VAT; my expectation is that Kern will make some adjustments and offer me something from which I ultimately benefit.

The topic of an expert is also interesting. You don’t do the 5-phase TÜV inspection yourself but have hired an external one for it, or is the external one an addition?

Did he find anything during the preliminary contract/attachments review (what is standard in such cases)?

Best regards
 

ECE-2021

2020-06-05 09:10:55
  • #6
That was just a preliminary discussion with the expert. He has not been commissioned yet.

Regarding the TÜV inspection:
5 phases is very few; in case of doubt, you won't notice errors, and furthermore, the company is commissioned by Kh as a standing order.

They certainly do not want to put the standing order at risk so easily, so one eye is quickly turned a blind eye to. After all, Kh pays for the services.

In principle, the services provided by TÜV/DEKRA for construction inspection are not particularly good. Experts are better suited for this (according to my current information).
 

Similar topics
03.07.2023Construction supervision by an expert?17
04.11.2012Expert despite TÜV approval?13
12.08.2014Construction method: Prefabricated house Solid house Construction supervisor Architectural planning18
24.04.2018Massive double garage vs. prefab garage vs. carport46
26.10.2015Have the house inspected by a professional / expert?12
19.07.2016Multi-family house (3 residential units, basement living area, double garage): Suggestions for planning24
17.02.2016KFW 55 in semi-heated basement - cold basement31
27.10.2016Costs for construction project city villa, 1 full floor33
09.01.2017Newly built city villa with a granny flat and double garage72
09.10.2017Single-family house - city villa - 160 sqm living area10
10.12.2017Floor plan design single-family house with VPD and double garage15
16.12.2018Floor plan design single-family house (city villa 140 sqm) on a slope with double garage495
08.03.2020House design city villa, 2 full floors, double garage30
05.05.2020Floor plan single-family house 190 sqm with double garage and front garden - ideas20
16.10.2020Floor plan design and orientation of urban villa, 2 residential units26
18.01.2021Floor plan city villa in Saxony-Anhalt - Check and suggestions29
10.11.2021Ground floor plan city villa 230 sqm18
27.05.2024Construction of an approximately 190 sqm city villa in Hessen (Wetteraukreis)71
16.07.2022Floor plan evaluation and double garage problem?16