Buchsbaum
2023-09-26 22:45:50
- #1
What do you want to see there?
18 modules Trina Vertex 405 heat pump x 120 euros each, the Huawei storage 5000, the Huawei Sun 6K WR came to 1000 euros, roof hooks 80 euros on classifieds, the rails on classifieds 150 euros, cables 100 euros and the smart meter 200 euros. 1000 euros for the electrician and 500 euros for miscellaneous like screws, nuts, cable ties, etc.
Just under 10k. I installed and laid the cables myself. I have my own scaffolding. The electrician connected everything to the meter cabinet, installed the smart meter, commissioned the storage and crimped the plugs for the strings as well as registered the system. That included the grounding cable and the RCD.
Any more questions?
Back then everything was still subject to VAT.
Today you can get the modules for 100 euros each, the storage and the WR also somewhat cheaper. In return, the rails and cables are a bit more expensive. It balances out.
I am a craftsman, I can cut the tiles myself, lay cables as well. I had to lay 30m of 5 x 6 square from the meter cabinet to the WR as well as the data cable. And it was 25 m from the modules with solar cable to the WR. 4 cables for 2 strings. I also had to do some digging and lay it in the ground. Of course in a suitable protective pipe.
Any more questions?
18 modules Trina Vertex 405 heat pump x 120 euros each, the Huawei storage 5000, the Huawei Sun 6K WR came to 1000 euros, roof hooks 80 euros on classifieds, the rails on classifieds 150 euros, cables 100 euros and the smart meter 200 euros. 1000 euros for the electrician and 500 euros for miscellaneous like screws, nuts, cable ties, etc.
Just under 10k. I installed and laid the cables myself. I have my own scaffolding. The electrician connected everything to the meter cabinet, installed the smart meter, commissioned the storage and crimped the plugs for the strings as well as registered the system. That included the grounding cable and the RCD.
Any more questions?
Back then everything was still subject to VAT.
Today you can get the modules for 100 euros each, the storage and the WR also somewhat cheaper. In return, the rails and cables are a bit more expensive. It balances out.
I am a craftsman, I can cut the tiles myself, lay cables as well. I had to lay 30m of 5 x 6 square from the meter cabinet to the WR as well as the data cable. And it was 25 m from the modules with solar cable to the WR. 4 cables for 2 strings. I also had to do some digging and lay it in the ground. Of course in a suitable protective pipe.
Any more questions?