It seems to me that you consider the lightweight wall profiles placed against wind loads on the sheet to be permanent and (as supposed spacers) as parts of the reinforcement (?)
The formwork boards apparently are not yet at their installation height.
Yes, you are right there. The OP has indirectly confirmed this with his response, if I am not mistaken.
I don't believe that the formwork boards are not yet at their intended height. After all, the OP wrote that the spacers were specially used to position the formwork.
Basically, it doesn't matter; for a floor slab supposedly fully prepared for concreting except for the reinforcement, in my opinion much is still unfinished. The pipes also don't look like they would still protrude from the concrete at a minimum slab thickness of 25 cm. But that could be deceptive in the pictures.