Sorry, I have to clarify a few things. The developer deploys his people for large projects, mainly entire residential complexes, etc. For smaller projects, he works in parallel with other construction companies, where he also does tenders and some of his people handle the work.
 

Peanuts74

2016-12-23 09:23:11
  • #2



Hmm, in the end the contractor (architect and developer) will always get what they can, right? Otherwise, why would they "give away" 50,000 euros if you signed for it? If the architect then supposedly realistically estimates 50,000 euros less (for whatever reason, that’s already a significant amount), I would state that as a "target sum" and pay close attention to the precise description of the construction services!!! You don’t want everything just to be done cheaper afterwards. I don’t know if that’s even possible with the architect in connection with the developer, but if realistically it would be about 365,000, one could maybe also set a maximum sum of e.g. 390,000 — a developer should be able to calculate that precisely…
 

Lisa.M

2016-12-26 18:59:43
  • #3
May I ask what your floor plan looks like? Like what rooms you have? Also storage space, etc. We also want to build as small as possible but don’t know if it’s possible to nicely and reasonably accommodate everything at that size.
 

Peanuts74

2016-12-27 21:49:47
  • #4
At 125sqm, storage space becomes tight, especially if you build without a basement and still have about 8sqm taken up by [Technik]... We have about 135sqm plus basement and actually only have proper storage options in the basement. Otherwise, it was more important to us to keep the rooms, especially the living area, as large as possible...
 

Wairwolf

2017-01-13 10:23:44
  • #5
We just had this experience after the sanitary selection. We held back (quote from the saleswoman: The surcharge for your standard is not that high...) and ended up with a material value of €14,000. The standard material value is €4,800. I was pissed off. Now we are having another selection done elsewhere. How did you manage to get your plumber to install the items and provide a warranty on them?
 

Knallkörper

2017-01-13 10:36:22
  • #6


Not at all!

Due to the additional selection, we had to pay 26,300 euros. The installer cannot be freely chosen, as it is determined through the general contractor.

The washbasins were the largest item at around 11,500 euros, but these can be found much cheaper online and I trust myself to do the installation. I then gave the installer the installation sketches for the washbasins so that he could correctly place his connections and the pre-wall module.

The shower enclosures are also a large item; if you want something high-quality, several thousand euros add up (we have two). However, the enclosures are much cheaper with the glazier, where we were also able to save a lot. For bathtub, shower tray, designer radiators, and the like, we had to bite the bullet.
 

Similar topics
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
03.08.2012Contract Supplement to the Construction Contract by the Developer36
27.07.2013Average construction time for a semi-detached house with a basement11
18.02.2014Massive problems with the builder - is contract termination possible?33
08.10.2014How do you search for a suitable property developer?30
06.11.2014Houses without basements: Storage space, hobby basement?49
08.12.2015uninsulated basement = wet basement?20
05.10.2016Costs numbering property developer/self-purchase/goods/assembly - ok?39
24.06.2017Semi-detached house, we have no basement, neighbor has a basement23
10.11.2017House plan by architect 2 floors with basement18
22.12.2017Construction costs for a single-family house with a basement in NRW84
08.07.2018Is a basement in a single-family house useful or rather too expensive?131
03.01.2019Terraced house neighbor without a basement?20
10.09.2019Trouble with the property developer, don't know what to do anymore13
26.12.2019Semi-detached house once with and without a basement! Who pays?23
10.11.2021Is underfloor heating in the basement useful??60
16.03.2022Additional construction costs when building a house with a developer88
22.12.2024Floor plan changes for end-terrace house from the developer133
29.01.2024Basement made of WU concrete or Poroton?17
10.12.2024Floor Plan Check Semi-Detached House - General Optimization + Storage Space18

Oben