Yes. The tiles currently being laid and the paint have of course introduced moisture again, but the plaster and screed have been dry since summer/autumn.
So, supposedly (according to the wholesaler) my heat pump is supposed to arrive next week. Hope dies last. Meanwhile, my heating engineer set up the mobile heating system (with 25°C supply temperature) again today.
Is the planned installation date still on for the new week? Please upload some pictures then. Thanks