PascalBW
2024-05-13 13:17:52
- #1
Is there a detailed cost breakdown from the architect, where the individual amounts listed above are itemized, or did he just roll 5 numbers and present them to you?
Without further information, the figures are meaningless.
There must be a reason why he is so far above the average.
Otherwise, I agree with nordanney... with the appropriate equipment, you can quickly reach such values.
Sure, with the appropriate equipment, but that was neither requested nor communicated.
The specification was KFW 55, standard equipment, no frills like smart home, aluminum windows, special floor coverings, etc.
No, the costs are not itemized. It is only a rough cost estimate.
BGF is specified as 260 m2 and BRI as 910 m3.
The 700 costs are broken down, but I don’t think that really helps, does it?
7.1 | LPH1-4 | 12000 |
7.2 | LPH5-9 | 50000 |
7.3 | Surveying | 1600 |
7.4 | Structural planning | 7000 |
7.5 | Verification statics | 3000 |
7.6 | Soil investigation report | 2500 |
7.7 | Specialist planning | - |
7.8 | Energy consultant | 2000 |
7.9 | Safety and health coordinator | - |
7.10 | Building permit | 3000 |