Termination of cooperation with the architect after LF4 - What next?

  • Erstellt am 2020-06-07 13:16:09

11ant

2020-06-17 15:24:09
  • #1
As far as I know, the minimum post threshold also applies to receiving messages; even I, as a member with over 10,000 posts, cannot write to you.
 

laumar01

2020-06-17 15:51:20
  • #2
That is of course a pity. Then the question is how many contributions I need?
 

11ant

2020-06-17 16:07:45
  • #3
Currently, to my knowledge, >150 :-(
 

laumar01

2020-10-16 16:43:22
  • #4
Hello, after some time I wanted to get in touch again.

We have since received 3 offers from general contractors (GCs), which vary significantly in price for our house (living area 184m² (including half-counted 34m² terrace) with basement and integrated double garage): 600,000 €, 640,000 €, and 720,000 €, each including an estimate for excavation and disposal, but excluding other incidental construction costs.
Additionally, we have asked an architect. His cost estimate is based on 1490€/m² average price for the gross floor area of 379.7m² and 475€ x 1077 m³ gross volume, averaging about 540,000 €.
On top of that, there would be another 130,000€ incidental construction costs or, in the case of the architect, 180,000€ incidental construction costs due to his fee.

Now we are wondering with whom we should proceed.
The detailed planning with the architect is certainly better than that of the GC.
But how realistic is the architect’s cost estimate?

For the cheapest GC, we had the first offer updated because some things like gutters textually etc. were missing, which we took for granted. For that, he then smoothly added another 35,000 € on top, so we ended up at 600,000 €. Our concern is that this will continue like this during construction and he will add something everywhere if missing things are noticed again...
 

icandoit

2020-10-16 17:24:00
  • #5
I don't know your draft. But architect-designed houses often get more expensive. The architect calculated with about 1300 euros/m2, which is very ambitious. Is that an older gentleman?
 

11ant

2020-10-16 18:11:23
  • #6
Rather a typo: cubic instead of square.
 

Similar topics
19.03.2013Turnkey or build with architects?19
18.06.2013Too few incidental construction costs or is the cost breakdown okay?16
21.07.2013Cost estimates from two architects differ greatly!10
03.02.2014Cost estimate single-family house with garage11
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
08.09.2015Massive house by the architect, approximate costs?16
23.09.2015Responsibilities of the Architect in Tendering18
29.10.2015Is it normal for the purchase of land to be tied to an architect?16
19.01.2016Construction project with architects31
10.03.2017Payment of the architect16
12.10.2017Cost of enclosed space. First draft discussed with architects27
27.03.2018Questions about cost estimation per m3 FFM Hanau region14
11.07.2018Architects / Civil Engineer Service, Execution Plan, Scope26
30.11.2018Architect's Fee - Experiences10
28.02.2019HOAI or why architects have no interest.....38
01.07.2020Complete offer from the architect? Is the price reasonable?54
06.01.2022Architects or prefab house cost calculation and next steps27
12.02.2024Preliminary design via the architect and then tendering?16
03.11.2023Cost estimation for an extension to a new building13