Hello everyone,
and once again an update.
The roof is finalized. Today the photovoltaic system was installed on the roof.
Cables still need to be routed down and then connected to the inverter.
The house is connected, the main distribution will be installed soon.
Rough installations of all bathrooms are finished.
Windows installed. A few glass balustrades and some adjustments are still missing.
Insulation is mostly finished as well. Only our large common room is left.
Electrical rough installation upstairs is in progress.
Exterior plastering will come next week.
As soon as we finish the electrical work, interior plastering, blower door test, and then we’ll continue with drywall...
For the outdoor area I bought myself a small excavator.... :-o