Hi construction expert,

We have fully adhered to the development plan - says the architect!

Only the development plan allows a lot of freedom regarding length, width, and height. I have fully utilized everything, including a larger garage, but no basement.

The neighbor will probably build smaller but with a basement.

Let's see how it turns out - I want to start construction as soon as possible.

Best regards
Andi
 

willi22

2011-12-25 16:30:22
  • #2
Are you aware of the consequences if you build without a basement first? If not, then have your architect explain it to you. On the one hand, you cause your neighbors significant additional costs for necessary underpinning of your house if they want to build with a basement (which is not your problem, but certainly not optimal for a good later relationship), on the other hand, such underpinning is also not without risk for your house (e.g. cracks...).
 

Bauexperte

2011-12-25 18:53:12
  • #3
Hello,


On the one hand, he may not care about the neighbor – by the way, a basement is an expensive hobby and should be well considered – on the other hand, the architect and structural engineer of the neighbor’s half are responsible for ensuring that no problems occur during the underpinning.

Kind regards
 

willi22

2011-12-25 21:45:07
  • #4


If it were that simple... Certainly, it is the neighbor's problem - but if there is a wrong or faulty planning, you first have a lot of stress to deal with. Whether you then have the desire and the money to engage in years of legal disputes with your neighbor is another matter. It is certainly better to solve such things in advance or to be aware that there may still be problems.
 

Bauexperte

2011-12-26 10:06:48
  • #5
Hello,


That is always better; however, as you can see from the thread here, it is not always feasible that the person with basement ambitions starts with their building application first.

I don't know what worries and concerns/experiences occupy you, but using the moral cudgel in favor of the basement still seems questionable to me.

Best regards
 

perlenmann

2011-12-26 14:38:02
  • #6
Hello Willi,

since I am practically in the role of the "neighbor who wants to build a basement"….
As I wrote, all house dimensions were given to me by my neighbor, since she is alone, but there are four of us, that was too little space for us. Therefore, we had to build a partial basement. I wouldn’t have been upset with her for that, since she was first. I am only upset with her because she gave us the specifications and has now sold (had to sell) the house.
Well… C’est la vie

So Andy, be glad you hold the reins.
Your neighbor only has himself to blame for not having submitted a building application yet!
 

Similar topics
18.02.2011Architect totally messed up - experiences?17
27.12.2015Who has built with an architect? Experiences??85
27.04.2016Floor plan design basement, ground floor + attic floor12
06.05.2016Single-family house floor plan with basement, version 223
23.09.2016Architect and budget limit... insurance? possibilities25
09.12.2016Single-family house with basement - optimization suggestions?12
01.02.2017Basement originally partially concrete, now possibly completely brick-built28
17.10.2017Construction costs for a single-family house 190m² + basement including a granny flat28
10.11.2017House plan by architect 2 floors with basement18
15.12.2017Expected construction costs in Hessen: architect vs contractor93
05.09.2019Construction project single-family house 140 sqm with basement44
18.06.2019Single-family house - approx. 150 sqm - without basement - Who has ideas? Thanks237
06.10.2018Single-family house planning - approx. 170m2 without basement13
22.08.2019Flat roof of 170 sqm with a basement on the slope33
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
25.11.2019New single-family house approx. 174 m² floor plan architect55
05.07.2020Floor plan single-family house approx. 200 sqm double garage basement32
07.06.2020Single-family house optimization and planning (180 sqm + attic without basement)159
22.11.2020Floor plan single-family house 180 sqm + basement in Rhein-Main38
02.01.2021City villa floor plan 180m², basement, 3 children - Your opinions on this?51

Oben