Hi everyone,
A quick update from me in between. Surveying via work phone didn’t work because apparently only the iPhone 12 Pro has the sensor. So I took a distance measurer and a tape measure and measured everything from scratch and created a new plan per floor. Based on that, I implemented the different kitchen variants in the plan and discussed them with my better half. It will now most likely be the variant in the attachment (not planned down to the centimeter yet). I would have liked to narrow the bathroom a bit, but it fits directly with a beam that we currently have in the kitchen (visible) and in the bathroom (in the wall) and is directly under the upper floor wall, so for me it is the more logical option to simply rebuild the wall that apparently used to be there.
Parallel to the measurements, we now have a construction company on hand that has a good reputation and does a good part of its business with old building renovations. Additionally, we have an appointment next week with an engineering office and an energy consultant so that we can start planning. The bank has generally given the green light, but we also have another appointment there to clarify the maximum budget, since the last appointment was a few weeks ago.
Things remain exciting... Thanks again for your input!
