It would be helpful if you posted the original plans (in floor plans and sections) instead of your redrafts and got used to the German flag in the plans (existing black, new red, demolition yellow). Too many significant detailed information are lost in redrafts of actual conditions. Moreover, I find it confusing to imagine a new everyday entrance in a monochromatically combined plan through the existing sink.
Variant of our architect, with whom we ended the cooperation due to lack of trust...
That I am also assisting with the search for an architect, I now assume is known, as well as my contact method. However, interesting for the local "public" discussion would be where and at what point the "chemistry" with the previous architect failed. By the way, his service phase 1 should actually have included the inventory (measurement or inspection of building files), which would have provided the discussion with a useful basis.
Furthermore, you should have already learned here in the forum at the latest that the attitude
In most points, we are already sure about what we need or want.
(meaning only to ask where you have
already recognized a need for advice) is often not sufficient based on experience.