Basti1503
2015-01-09 08:51:07
- #1
After a long break, a message again
We are now waiting for the last offer, from which we expect the most
It is a revised offer from the provider who already submitted the first offer to us. It is the floor plan posted here. We have slightly revised the floor plan to enlarge the kitchen. We also had a conversation with the general contractor, his heating engineer, and a sales representative from Stiebel Eltron. We want an air-to-water heat pump with a ventilation system with heat recovery. The system will still be calculated by Stiebel based on the floor plan and included in the offer.
We already had a financing consultation shortly before Christmas. Frightening amount, but according to our advisor, no problem, even if one salary fails.
So we are now approaching the decision on whom the contract will be awarded to, then a precise financing plan will be made based on the existing offer, and then it can start soon
We are now waiting for the last offer, from which we expect the most
It is a revised offer from the provider who already submitted the first offer to us. It is the floor plan posted here. We have slightly revised the floor plan to enlarge the kitchen. We also had a conversation with the general contractor, his heating engineer, and a sales representative from Stiebel Eltron. We want an air-to-water heat pump with a ventilation system with heat recovery. The system will still be calculated by Stiebel based on the floor plan and included in the offer.
We already had a financing consultation shortly before Christmas. Frightening amount, but according to our advisor, no problem, even if one salary fails.
So we are now approaching the decision on whom the contract will be awarded to, then a precise financing plan will be made based on the existing offer, and then it can start soon