hemali2003
2016-06-09 13:30:34
- #1
Nice of you to ask. A few minor changes have been made – for some things I am waiting for feedback from the developer. We removed the partition wall in the upstairs bathroom and arrange the sanitary fixtures around it. On the ground floor, we would like to keep the bathroom in the new position (because it is significantly more spacious than the option with a shower carved out from the utility room and we can take space from the kitchen well). We are still tinkering with the kitchen... Actually, we really like the size and look of the planned kitchen and also the idea of the pantry. Therefore, we removed the narrow corridor from the pantry and would probably assign this as a built-in closet/wardrobe to the hallway. That is the current plan – we still have several months until the decision, a start of construction before spring 2017 is not planned.