Hello you two!
I am still in the process of drawing the floor plan in SweetHome 3D. Unfortunately, as a beginner, it is taking longer than expected. I will upload it here tomorrow evening. Afterwards, we will have a better basis for discussion.
However, I would like to answer a few points already now:
Kniestock:
60 cm from the bottom edge of the roof beam to the concrete ceiling (without screed)
Umgestaltungsmöglichkeiten:
I am the owner of the entire house, i.e. I have access to the first floor, which is also to be renovated. The eastern part of the ground floor will also be renovated, i.e. everything east of the staircase.
Brauch- und Abwasserstränge:
I hesitate to relocate the toilet and kitchen waste pipes as well as the utility water pipes to the eastern side on every floor. There are no water and sewage pipes on the eastern side. However, I can well imagine moving the kitchen waste pipe a few meters. The bathroom on the first floor is also to be renovated, so I have some freedom here.
Eingang:
I could easily relocate the entrance. The staircase also urgently needs to be renovated (glass blocks).
Best regards,
Flasher
I am still in the process of drawing the floor plan in SweetHome 3D. Unfortunately, as a beginner, it is taking longer than expected. I will upload it here tomorrow evening. Afterwards, we will have a better basis for discussion.
However, I would like to answer a few points already now:
Kniestock:
60 cm from the bottom edge of the roof beam to the concrete ceiling (without screed)
Umgestaltungsmöglichkeiten:
I am the owner of the entire house, i.e. I have access to the first floor, which is also to be renovated. The eastern part of the ground floor will also be renovated, i.e. everything east of the staircase.
Brauch- und Abwasserstränge:
I hesitate to relocate the toilet and kitchen waste pipes as well as the utility water pipes to the eastern side on every floor. There are no water and sewage pipes on the eastern side. However, I can well imagine moving the kitchen waste pipe a few meters. The bathroom on the first floor is also to be renovated, so I have some freedom here.
Eingang:
I could easily relocate the entrance. The staircase also urgently needs to be renovated (glass blocks).
Best regards,