Hi,
I am new here.
Regarding the topic, my wife and I plan to build our single-family house within the next 1.5 years.
We have a plot of land that is supposed to be designated as a building area next year. It is currently almost finalized. The plot slopes slightly, and a basement is required. Development costs will, of course, be incurred accordingly.
We plan a house with approximately 160-175 m2 if it fits into the budget.
We set a budget of about €430,000 for the house, development and ancillary construction costs, kitchen, garden, carport ([fertiggarage]) as mentioned, the plot is available.

As personal contribution, we can carry out interior doors, flooring work, windows and front door as well as roller shutters and blinds since these will be purchased from the company at cost price and installed.

In your opinion, is this feasible? Is our budget sufficient?

Thanks in advance for your answers.
 

Bookstar

2018-08-11 22:24:23
  • #2
With very basic equipment it would work. With upscale [Ausstattung] not. Then about 50,000 to 100,000 are missing.

Depending on the federal state.
 

ypg

2018-08-11 22:36:00
  • #3


Should the €430,000 also cover the plot of land with all the additional purchase costs?

140 sqm x €2000 = €280,000
Basement €60,000
Incidental construction costs €50,000
Outdoor facilities €25,000
Kitchen, furniture and lighting €20,000
Carport €5,000-10,000

It can work well or better if you leave out the basement and plan on two levels.
 

AndreasGMT

2018-08-11 22:55:36
  • #4
Good evening,

The property already belongs to us but still needs to be developed.
Windows, front door, roller shutters, blinds will be carried out in-house as these tasks are performed by our own company, and are therefore purchased under dealer conditions.
 

ypg

2018-08-11 23:12:11
  • #5


Well, that’s on top of that. Do you already know how much that will be?

In-house work or services also cost material.
Are you then building with an architect? The main thing is that the Energy Saving Ordinance is ensured, but you don’t really save much through the “own company,” after all, this company doesn’t work for free if warranty is to be guaranteed.
 

Alex85

2018-08-12 11:26:45
  • #6
Could be tight.

Have you already checked the financing? How long has the self-employment been established?
 

Similar topics
14.08.2012Build a home? Land in prospect19
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
11.10.2022List of incidental construction costs. More expensive "on the builder's side"?154
03.02.2017Single-family house 2 floors without basement - floor plan - costs - feasibility?24
04.03.2015Budget plot and building with basement21
29.07.2017Beginner questions about house building44
10.02.2020Place house, garage / carport on the property93
11.10.2018Building without a basement - carport, garage?18
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
28.07.2020Single-family house 160m2 with basement, 500m2 plot108
09.10.2020Single-family house 220 sqm with basement on 700 sqm plot41
13.10.2020Land available - ancillary construction costs, ancillary house costs, financing?34
19.10.2020Street about 50cm above the property - backfill or basement24
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
12.07.2021Hang property, catch carport22
04.03.2022Property development - basement yes or no?75
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
18.04.2024Floor plan design: Single-family house; with basement; 800 sqm plot10
07.12.2024Floor plan check for new single-family house with basement43

Oben