Hi and welcome! I think you can even get more square meters – the basement is of course expensive (somewhere between 30 - 60 thousand). I think it is important to search very thoroughly for the right partner for your project; that took us the longest, because we simply could not believe that every architect, general contractor, and/or prefab house provider knows better than the other – in the end, we were right about that! Best regards and good luck PS Always stay calm and sleep on it once!
 

Grantlhaua

2018-08-13 08:17:25
  • #2
Hello,

we are building a house next year with 184m2+basement+double garage and have already received most of the offers. We are currently around €500,000 including buffer and outdoor facilities, but have also planned high-quality fittings (high-quality windows, central ventilation system, very large kitchen, 3 bathrooms, living basement with hobby room,...)
 

Maria16

2018-08-13 08:23:23
  • #3


Because I have read several times now that offers are obtained well before the execution date: are the requested companies actually bound to them for that long?
We were also sometimes involved three or four months before the execution date and then heard several times during execution that the offer would no longer be given in that form but would require a higher price.

For acquaintances, it even went so far that the roof start being postponed by four months led to the roofer wanting significantly more money and they had to start looking again.

So, how does it work for you?
 

Bookstar

2018-08-13 08:24:31
  • #4
Can work, but it will be tight. You definitely have to do a lot yourselves.
 

Grantlhaua

2018-08-13 08:35:22
  • #5


The companies know when we will start building. With the major trades (shell construction, roof truss, ...) this is not a problem. The smaller ones (screed, ...) didn’t want to commit so far into the future yet. That means, I have the concrete prices presented, but then I simply included a surcharge in my planning.
 

face26

2018-08-13 08:39:29
  • #6


...I would be interested in the breakdown... it seems quite inexpensive for Bavaria, especially if that already includes contingency, outdoor facilities, double garage, etc....
 

Similar topics
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
19.03.2014Cost for a new single-family house, 2 full floors, without basement18
04.03.2015Budget plot and building with basement21
04.01.2016Floor plan single-family house with double garage15
31.08.2016Estimate of construction costs for a single-family house with double garage and hipped roof51
30.05.2017First draft single-family house 150m² with basement38
09.01.2017Newly built city villa with a granny flat and double garage72
13.04.2020Basement or garage, or basement with integrated garage14
19.08.2017Construction costs in BW for a single-family house with a 200m2 basement and double garage38
05.10.2017Cost of a single-family house 180m2 with basement and double garage14
10.12.2017Floor plan design single-family house with VPD and double garage15
18.05.2018Single-family house with >180 sqm / basement / garage68
16.12.2018Floor plan design single-family house (city villa 140 sqm) on a slope with double garage495
19.11.2018Design / Improvement Single-family house 150-175m² with hip roof and basement39
20.11.2018First floor plan draft of the ground floor including double garage16
28.02.2019Land planning Single-family house on a north slope with basement13
11.11.2020Newly built single-family house with 2 full floors and a double garage, 150 sqm77
30.07.2019130 sqm L-shaped bungalow including double garage35
13.10.2019Floor plan design single-family house with basement and double garage on 540 sqm26
05.07.2020Floor plan single-family house approx. 200 sqm double garage basement32

Oben