.. where did you get the picture? Google? Then better delete it .. the rights are not granted. And you also can’t really see it clearly. In any case, it is also a staggered pitched roof.
 

jaeger

2016-07-31 21:28:15
  • #2
No, with Google there is usually not such good quality. Probably taken with the quadcopter itself
 

Mike12345678901

2016-07-31 21:29:20
  • #3
No, this is a private recording of mine. The fact that you can’t see more is intentional.

Otherwise.... staggered shed roof, yes.
But for me, it was more about digging out or filling up.

As said, so far it has simply been dug out at the back and done.
 

kbt09

2016-07-31 21:41:06
  • #4
Are the other plots also with more than 3m height difference or less? If more than the +/- 75 cm permissible according to the development plan have been removed, then you also have to consider protective measures against the neighbors.

And somehow flattening the terrain and accepting an abrupt terrain rise doesn't really make sense for garden design. As I said, I also see it as a cost factor because quite a lot of earth has to be moved.
 

Mike12345678901

2016-07-31 23:07:19
  • #5
Whether everyone now has a 3m height difference, I of course cannot say, but at least the immediate neighbor has 510.35m at the back like us, and thus a 2.50m difference to the street side.


Yes, you’re right there. As I said, I would level the property as much as possible to 510.xx according to the described method.

Let’s see what the BU says.

Regarding the costs:
The BU has currently set 12 hours for leveling. If I now add 2 x 8 hours as a safety buffer, I will definitely still remain within my set budget cost-wise. I can’t imagine it taking longer now.
 

kbt09

2016-07-31 23:12:21
  • #6
Well, he should first make a plan of how the access from the street with 507.8 m would be. And anyway.

And what does 12 hours mean? 12 hours of temporary help or 12 excavator hours including excavator rental etc.?
 

Similar topics
29.04.2014Combination of shed roof and flat roof14
03.09.2014Pitched roof or gable roof? We have to decide16
27.04.2020Which roofing material is suitable for a flat shed roof?11
03.07.2016Satellite system on a 5° pitched roof12
24.03.2017Garage construction and height difference18
21.04.2018Pitched roof: Should the ceiling be suspended for visual and heating reasons?12
26.04.2018Plot on a slope, height difference approx. 4 meters12
18.07.2018Single-family house with two full floors, shed roof, no basement31
02.02.2019Semi-detached house with continuous shed roof12
22.07.2020Grill corner walls height difference24
27.11.2020First draft: 2-storey with staggered shed roof28
09.05.2021Shed roof or rather hip roof for a bungalow?35
18.05.2021Inspiration two-storey with shed roof (or stepped floor)11
21.08.2021Shed roof 20 degrees - without attic?19
12.10.2021Driveway slope / height difference20
19.04.2022Roof covering shed roof 8° - bitumen?13
14.03.2023How to compensate for a height difference of 13 cm over 6 meters to the neighbor?17
15.08.2023House construction planning: timber frame house, log facade, shed roof35

Oben