Floor plan design and placement - Single-family house approximately 200 sqm on a 900 sqm plot

  • Erstellt am 2021-05-04 20:49:08

11ant

2022-05-02 01:17:34
  • #1
I have to admit some surprise that the considerations (after all, ten months since the last post) still indicate an implementation that has not yet been completed. Against this background, if I look again at your house design, I fear that you should be urgently and emphatically advised to take independent expert construction supervision very seriously. Am I right in assuming that you are reenacting the death-defying mission of , having a design with gourmet architect house details executed by a general contractor? I interpret "structural reasons" for parapets of this minimum height as beams or as elevated lintels because of large windows / roller shutter boxes on the ground floor. If I remember correctly, the robber once "used up" a magazine with four experts :-(
 

Samantheus

2022-05-02 10:01:08
  • #2
The questions here were at a very early planning stage. We are actually well on schedule. In the meantime, we have completed the submission plan, then another draft plan, and now the work plan is also finished (except for the window). The excavation for the basement is just beginning. The house already standing was never planned. Yes, the implementation is being done with a GU. I don’t know what went wrong with that colleague, but I’m not really worried. The GU is a regional family business and very well known in the area. We personally know several people who have built with the GU and were very satisfied both with the process and the result afterwards. Yes, these are lintels. On the ground floor we have a 3.5 m lift-and-slide door. We had the choice between a steel column in the living room or the raised parapet height on the upper floor. We decided on the latter. Construction supervision is planned; I hope we won’t need four....
 

Similar topics
03.07.2023Construction supervision by an expert?17
27.02.2015Burglary-proof windows?33
03.06.2014Interior design - windows14
16.01.2018Is an extra charge for colored windows realistic?19
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
13.09.2016Looking for construction supervision NRW, Münsterland16
27.05.2015Huge problem with condensation on the window34
20.12.2019Trefz window prices and experiences?14
26.01.2015Window between two rooms13
17.02.2015KFW funding sensible / Energy advisor, construction supervision?10
13.03.2015Opinions on window parapet height sought30
09.04.2015For porthole, special regulations? Window, single-family house 1.5 stories.18
22.04.2015Window, roller shutter, exterior plaster10
26.10.2015Have the house inspected by a professional / expert?12
11.09.2016KfW - Construction supervision / verification / acceptance23
03.01.2022Construction supervision via Bauherren-Schutzbund, Association of Private Builders, TÜV, DEKRA, independent expert surveyor, or "xyz"...?57
09.07.2016Construction supervision in the Dortmund area: Association of Private Builders or SV11
18.10.2020Window & door installation not compliant with standards28
02.11.2021Bathtub in front of window, railing too low, contractor is obstructing48

Oben