DASI90
2022-10-27 21:47:19
- #1
I wanted to give feedback again. Thanks to everyone for your contributions at this point. By now I understand well that the installation of the cistern has its price. The installation at or above this size is already complex. The cistern is now in its final position and was today backfilled with gravel after we filled it to 1/3. Now all connections plus cistern pump and re-supply follow.
On the topic of subsequent electricity: Here we decided to lay a cable via the aforementioned free circuit. The garden landscaper exposed the house connection and the electrician pulled out 1 heavy current cable as well as two bus cables on the same occasion, because we are planning an additional bell system at another location. Everything worked out brilliantly so far.
: Do you happen to have a greenable shaft cover? The garden landscaper said that exists, but the one he knows is very heavy.
On the topic of subsequent electricity: Here we decided to lay a cable via the aforementioned free circuit. The garden landscaper exposed the house connection and the electrician pulled out 1 heavy current cable as well as two bus cables on the same occasion, because we are planning an additional bell system at another location. Everything worked out brilliantly so far.
: Do you happen to have a greenable shaft cover? The garden landscaper said that exists, but the one he knows is very heavy.