What is the approximate figure in terms of costs for the following overall:
- Builder's liability insurance,
- Fire-shell insurance/residential building insurance,
- Construction all-risk insurance,
- Accident insurance for construction helpers,
- Liability insurance for undeveloped land?
 

hampshire

2021-01-12 19:27:43
  • #2
Without having researched: write down 1000€.
 

bauenmk2020

2021-01-12 19:36:54
  • #3
Maybe included in your contract as a so-called "builder's protection letter"?

- Construction site porta-potty?
- Entrance platform?
- some also calculate with a "crane parking space" (approx. 900 EUR). But in our case, it was located on our future garage spot, which we prepared together with the house beforehand.

Construction helper insurance will be handled later by the BG Bau. I think you can expect about 1.5 EUR per helper per hour?

Isn't there a thread about this in the forum?
 

ypg

2021-01-12 20:05:11
  • #4
Splash protection around the house 2000 Building water/electricity rather 2000 Surveying costs 3000 Permits 1500 Entrance platform 2000 The mentioned surcharge confuses me. Are you building with an architect or a general contractor? If the latter, then earthworks 10000, rainwater cistern 5000, electrical upgrades 3000 and more are missing.
 

Mertha257

2021-01-12 20:06:11
  • #5
No, unfortunately we don’t have a builder protection letter or similar. Construction site porta-potty and entrance platform are included, crane parking space is not; I will address that directly tomorrow. Thanks for the tip! I will look into the construction helper insurance here again.
 

Mertha257

2021-01-12 20:09:41
  • #6

Thanks, ypg!

Is such splash protection always necessary or not included in a turnkey house?

We only planned with an architect, building with a general contractor. We raised the earthworks again by EUR 10k during the negotiation process, after soil surveys, inspections, etc. We already included electrical work above the "normal standard" in the general contractor’s offer, that should be fine.

Regarding the rainwater cistern: we decided against it.

Thank you very much for your feedback!
 

Similar topics
19.07.2018Draw the plan yourself? Do you necessarily need an architect?11
18.02.2011Architect totally messed up - experiences?17
30.09.2012Final invoice architect13
27.10.2013Architect --> Agreements? What is that?21
17.06.2014Presentation of a construction financing variant18
31.03.2015Property / Financing amount / Insurance? Experiences10
13.05.2016Which of you has disability insurance?114
05.03.2017Entrance platform with one step made of natural stone13
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
20.11.2017Consequential water damage - Experiences with insurance?25
15.12.2017Expected construction costs in Hessen: architect vs contractor93
05.06.2019Search for real estate loan advantages/disadvantages insurance vs bank22
23.09.2020Splash guard for facade and transition from lawn to flower bed24
17.02.2024Splash guard around the house - tips33
01.02.2021House base - splash guard or is there still more missing?11
26.08.2022Is builder's liability insurance necessary for renovation in existing buildings?17
15.03.2022Cost planning for earthworks33
10.01.2023Insurance for employed construction helper minijob16
12.07.2024Employ a mini jobber as a construction helper?17
14.09.2024New construction cost calculation, suitable for architect?30

Oben