Hello everyone,

due to current circumstances (just before signing) I would be interested to know what you have upgraded beyond the standard in your house construction (especially when building with a general contractor) or had to, and what the price or price difference was?

Thank you very much
 

goalkeeper

2019-11-05 08:46:17
  • #2
- Foundation / Earthworks
- Windows (security)
- Front door (transponder and self-locking lock)
- Tiles (stainless steel rails + mosaics)
- Stairs (colored risers + stainless steel railing rods)
- Electrical (various sockets, LAN outlets, and stair lighting)
- Sanitary (different toilets, rainshower showers, etc.)

So somehow almost every trade. Surely more will be added.
 

Scout

2019-11-05 08:46:56
  • #3
We settled almost everything directly with the trades, as was also preferred by the general contractor (GU) (if calculated in advance for financing, it would have been at least just as expensive, often even 30 to 50% more expensive). Many things like tiles (instruction: "5 samples, up to 25 euros. If different, please contact the tiler directly") simply could not be registered with the GU under any circumstances.

Tiles (different ones, rails, joints)
Moving walls
Better doors
Stair builder (risers)
Painter (silicate instead of dispersion paint)
Sanitary/heating (concealed installation, underfloor heating in the bathroom, radiators in the basement)
Electric (a huge bunch: more sockets, fuses, empty conduits, network sockets, outdoor cables, satellite...)
Drywall builder: shower niche

With the GU directly: all floor plan changes in advance, afterwards it would have become really expensive. Stops on windows and doors, which we wanted to change afterwards, cost 150 euros per change.

For electrical and sanitary work, I could imagine the highest savings potential before signing.
 

haydee

2019-11-05 09:19:29
  • #4
Electricity 2,000 euros with craftsman directly
Staircase different paint 430 euros with craftsman directly

that's it. However, the general contractor has no construction service description. He creates everything individually. The sampling was not in a fancy big center. Everything necessary was there. Tiles and staircase in the studio. Bathroom was possible, that is standard, that is the catalog, if you don't like it we go to the bathroom studio. Only then. He no longer feels like spending half a day in the bathroom studio, holding back the builder. Then the offer comes and it starts all over again. Because now it is understood that the freestanding bathtub, the rain shower, and the super design faucet exceed the budget.
 

Nordlys

2019-11-05 09:21:16
  • #5
Not much for us. The earthworks and such are not upgrades. Otherwise: another outdoor water tap, a utility sink with hot water connection in the utility room, some sockets and switches, outdoor lighting, garage electricals, satellite system, a bathroom furniture set, a somewhat fancier front door. Our upgrade budget remained in the range of 3000,-
 

goalkeeper

2019-11-05 09:45:51
  • #6


For us, they are.
 

Similar topics
06.01.2015Where to place the staircase? Attic conversion hip-roof bungalow19
15.10.2015Kitchen planning with deep windows43
26.06.2015Floor plan question, stairs, window, orientation12
24.12.2015Electrical planning - sockets88
11.02.2016Windows / Doors / Wardrobe13
13.04.2016Electrical planning: Where to install sockets, LED and LAN outlets?19
31.07.2016Electrical inspection, Q2, bathroom tiles, knee wall, floor-to-ceiling windows23
01.09.2016Tiles loose under stair supports24
19.08.2018Which tiles to choose for the entrance area? What did you choose?29
18.12.2018Underfloor heating, laminate, or tiles: which is warmer for the feet?35
02.08.2019Costs for plumbing & heat pump31
14.09.2020Which areas in the bathroom are tiled?58
08.04.2021Building without antenna and SAT-CAT cable without conduit?65
29.09.2020Walk-in shower with floor-to-ceiling tiles18
13.10.2020Planning sockets and burn sites36
07.08.2021Buy tiles cheaper somewhere else?39
22.06.2022Bathroom tiles floor-to-ceiling or half-height tiles?32
23.07.2023Get the stairs retiled and now the step is too high26
20.09.2024New construction - Costs of plumbing & heating experiences?15

Oben