The building authority rejects the building application because the house is planned too far back

  • Erstellt am 2020-09-29 11:44:49

dynaudio79

2021-01-30 11:32:12
  • #1
In the meantime, quite some time has passed and construction has slowly begun.

The next step was the confirmation of the masonry drawings by the planner.
Even from a brief look during work, I saw that something was wrong.
In the evening, then with some calm and a beer, I had to realize that the walls in the bathroom upstairs had been shifted and the wall thickness had also changed.
Then I went into more detail and ultimately found that the floor plans for the building application were incorrect back then. Specifically, the chimney from the ground floor to the upper floor is not correct.
She apparently noticed this now and simply moved walls without pointing it out. I thought I was losing it. Additionally, the wall between the shower and the children's room was thickened from 17.5 to 24. Must have eaten too much Christmas goose.

Since the shower was precisely planned in advance and took a lot of time to use certain tiles without cutting them, I had to save the situation again and move the walls so that it fits again. The bathroom naturally became smaller as a result. That was clear.

The consistent thread doesn’t break....
 

nordanney

2021-01-30 11:48:02
  • #2
Then I'll keep my fingers crossed that it actually works. Because in construction, there is no delicate work. A deviation of one centimeter is practically a perfect score.
 

dynaudio79

2021-01-30 11:56:40
  • #3
I know that and it is of course also calculated. Since you do not address the actual topic, I assume it seems normal that they change floor plans? Uh, by the way, we're talking about 18cm that I then had to correct again. So it would be a 120cm tile and an 18cm one next to it. Visually really very valuable....
 

icandoit

2021-01-30 11:57:00
  • #4
Deviations from the building application are normal. Even for structural reasons, deviations can occur. Checking plans is the task of the client. Take your time for it. Best without beer. Then report the defects in writing. Have the plans changed and only approve them when everything is OK.
 

nordanney

2021-01-30 12:06:01
  • #5
Yes, it can be normal within the scope of planning. However, it is not normal to discuss and coordinate this with the client.
 

Pinkiponk

2021-01-30 12:16:56
  • #6

Is there a missing "not" in the sentence or is it meant as written? Thanks. :)
 

Similar topics
17.12.2014Building application "deferred". What does that mean?19
30.10.2015Can the building application be submitted this year?14
01.02.2017Building application is becoming increasingly complicated!20
20.06.2017Flush shower finished and problem with sealing25
08.04.2018Is underfloor heating necessary in the shower? What do you think about it?35
04.05.2018No hot water is coming in the shower anymore...13
18.07.2018Garage construction made of concrete! 3 walls or house extension? What do you think?26
14.10.2018Building application - delay due to neighbor's lawsuit - experiences?21
17.12.2018What is set in stone in the building permit application?10
26.02.2019Submit a building application before the land is paid for?11
23.11.2019Receive various floor plans for the notary appointment10
27.11.2020Myth?! "Breathing Walls" What is the truth?54
05.08.2020Building a garden shed... Is a building permit necessary? Detours?17
30.11.2021Fee notice for building application57
09.05.2022Building application due to parking spaces not approved. What can happen?30
25.05.2022Garage is higher than in the building application.28
08.02.2023Which of the two floor plans is better?20
03.03.2023Building permit application without height survey?15
10.03.2023Preliminary building approval positive, building application criticized position29
12.01.2025Comprehension question: Gable roof - load-bearing walls - floor plan11

Oben