Screed has been in for three days and is still wet?

  • Erstellt am 2023-07-23 13:44:39

Bauherrin123

2023-07-24 12:46:36
  • #1




Thanks for the answers. We have cement screed. So yesterday, on the third day, the neighbors were inside, apparently it's the condensation water that causes the puddles and drips down from the attic foil again. We are going there today. According to the site manager, ventilate completely for 30 minutes once.

After that, we start ventilating four times a day, first one side then the other for 15 minutes each to avoid cross ventilation.

Regarding the walls, currently Q2 but the painter is doing Q4.. I don’t know much about Q1234, just passing on what Mkr said about the weather.

From my feeling, I want to let it dry for 2 weeks first, then consider which craftsmen to bring in. It should be ventilated properly now. If it’s reasonably dry, then drywallers, electricians, etc. The painter should wait 4 weeks so the plaster can dry longer.
 

motorradsilke

2023-07-24 13:16:17
  • #2
You will have to wait for the drywall installer. He should only start once everything is completely dry, otherwise you'll end up with mold in the drywall panels.
 

WilderSueden

2023-07-24 13:24:52
  • #3
Do you coordinate the trades yourselves? A reasonable site manager should know the distance to be planned between the screed and the following trades.
 

Buchsbaum

2023-07-25 08:24:35
  • #4
Now in summer the humidity is of course very high. That makes drying difficult.

I always refer to the enormous amounts of water that are brought into a house with plaster and screed. I have always done it somewhat staggered because simply too much water would have come into the house.

When interior plaster and screed are installed, a few thousand liters come into the house and masonry. One should be aware of that.
And they have to be slowly brought out again. You can ventilate and heat as much as you want, it simply takes its time.

A painter or drywall installer would not come into my house at all.
 

Bauherrin123

2023-07-25 08:28:22
  • #5
No, actually the site manager. But since we can't always rely on him, we question everything and decide ourselves or tell the site manager what he has to do. Yes, unbelievable, but we do his work too.
 

Buchsbaum

2023-07-25 08:29:57
  • #6
Roughly estimated, I would say that interior plaster + screed for a house with 150 sqm living space are roughly around 15,000 - 20,000 liters of water. That's actually crazy.
 

Similar topics
02.01.2014Building dryer - a must?49
01.04.2020Construction Manager Area Neukirchen-Vluyn (Duisburg/Kleve/Wesel)10
10.05.2015Screed uneven - defect removal refused52
28.04.2016Order screed - plaster14
18.05.2020Proper Ventilation/Drying of Interior Plaster / Drying Time21
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
09.08.2017Is exterior plastering possible before interior plastering in summer?10
01.09.2019Interior plaster on the exterior wall is not complete24
13.05.2020Self-adhesive vinyl on screed20
25.10.2020Main connection box installed before interior plaster in the utility room20
10.11.2021After screed, mold or mildew stains?22
25.11.2021Getting rid of moisture from the shell construction - how to ventilate and other topics18
03.12.2021Heating phase, screed, window position20
25.02.2022Too much moisture in the single-family house after screed installation? Risk of mold?49
10.02.2022Screed heating program incorrectly set and heating coil loosened18
26.02.2022Concrete floor without screed on the upper floor/attic, what to do?24
31.03.2022Bright lines on fresh interior plaster - future cracks?27
12.09.2022Damp wall due to lack of ventilation after screed39
27.11.2023Assessment of costs for the shell construction and total costs (plaster, screed)17

Oben