Property purchased - start construction planning before handover?

  • Erstellt am 2021-06-02 16:41:44

hanghaus2000

2021-06-03 00:02:07
  • #1
The question remains unanswered. Then sign the contract first.
 

hanghaus2000

2021-06-03 07:52:04
  • #2
If the plot is flat, then you don't need a survey at first. Is the plot in the [Geoportal]? Then you can get the survey points from the surveying office for a fee.
 

ypg

2021-06-03 09:02:34
  • #3
Congratulations! Is the sand load-bearing? I would ask if the building ground survey can already be done. That means, first playing around a bit with the dimensions, orientation, house ideas, concepts, and floor plan. After that, a preferred position of the house usually emerges. Have a soil survey done, architect or general contractor, whom you, as you say, have already scoped out, create a plan in case a prefab house doesn’t fit. So in summary: engage with the future house and building partner.
 

Goldelse

2021-06-03 13:52:26
  • #4


Which question? Sorry, I must have overlooked that.
The contract is signed.

The tip about the Geoportal was good. In the BrandenburgViewer you can also see the soil levels of the surrounding fields (other side of the street): sand.
We can also read measurements there, but we are not quite sure because of the flatness. The front part appears to be level, this is where the house is supposed to be built (at the same height as number 9), the back part is wooded and slopes down in two steps about 1.5m lower.

(The picture is just photographed, the marked area is the stretch between the fence and the tree that is to remain.)
 

hanghaus2000

2021-06-03 14:08:42
  • #5
How long is the street frontage? I would rather position the house like No.5. Otherwise, you have the neighbor exactly to the south.

What is that at house No.5, it looks so messy?
 

Goldelse

2021-06-03 22:48:53
  • #6
The street frontage is 17.5 m, and it goes back almost 50 m. After 19 m, the property drops 1.5 m, where two steps and a staircase were built. And the area is very wooded. So you would have to fell a lot (if you get permission) and properly shape the terrain. We really like the little forest at the back; there is currently a hut and a nice shady and hidden terrace.

I have no idea what is going on at No. 5; when we viewed it, there were normal beds and it looked neat. No. 9 is completely being renovated.
 

Similar topics
13.09.2012Feeling pressured into a contract, is that normal?17
14.08.2012Build a home? Land in prospect19
22.09.2012Who else fell for a contract with a reservation clause? - Search13
09.04.2014Questions/neglected plot/meadow, determining construction measures44
06.01.2015First buy the plot, then calmly plan and build...?11
12.09.2022Terminate house contract before expiry - withdrawal clause/property25
10.09.2016Construction financing and contract with the developer24
16.09.2016False information about the property in the exposé39
31.07.2019Filling and compacting the ground for the house155
10.05.2017Transfer of property from mother-in-law to me and my wife41
05.09.2017Finance land/house separately - fixed interest rate11
10.03.2019Purchased land after demolition, construction debris in the ground34
06.06.2019Completion date in General Contractor Agreement - Wording assistance62
22.12.2019Crane from the neighbor on my property67
22.11.2023Location of city villa or single-family house on 500 m2 plot - rectangular585
05.08.2020Contract for land purchase - obligation to build within 2.5 years18
18.02.2021Ideas for building a house on parental land41
27.02.2021Prefabricated house including land planned - financing45
11.12.2022Garage position on the property - decision aid36
17.09.2024New development area - sloping plot19

Oben