Hello everyone,

we have now had our floor plan designed by an architect. Now we are approaching different companies to get quotes.

What is important so that the offers we receive are as comparable as possible? We have already written a list with points such as
Kfw 40+
Roof insulation
Oak staircase design
Wood-aluminum windows
Living-dining area with external venetian blinds (rest electric shutters)
Air-water heat pump

Is there perhaps a kind of template for this?
 

SaniererNRW123

2022-08-15 09:47:22
  • #2
I do hope that you also have a tender from the architect. With quantities and qualities. Otherwise, you will not receive a reasonably comparable offer.
 

Gudeen.

2022-08-15 09:54:08
  • #3
Sounds more like the OP only has a floor plan so far and is now looking for a general contractor. No separate awarding of already fully planned trades, right? Then objective comparability is very difficult anyway...
 

SaniererNRW123

2022-08-15 10:02:22
  • #4
I fear the same. Nevertheless, a tender (whether by the architect or someone else) is well-spent money. Otherwise, in the end, the seemingly cheapest general contractor will turn out to be much more expensive than planned.
 

driver55

2022-08-15 10:23:35
  • #5
Is the floor plan actually finished, or optimized/final? The topic was abruptly ended 3 weeks ago. :rolleyes:
First a), then b)…
 

Benzeller

2022-08-15 12:38:44
  • #6
Thank you very much in advance for the answers.

Our first floor plan was changed a little, but it is now final (we have two versions, one with a basement and one without). The architect works a lot with a company, from which she is obtaining an offer for us. We discussed this during the plan submission and she filled out a PDF created by the company. However, she is not allowed to give this out.

The contract we signed only covers the design and approval planning. Then I would still have to ask the architect if she can prepare this tender for us.
 

Similar topics
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
29.12.2014Floor plan ground floor + upper floor for semi-detached house29
20.01.2015The floor plan should be it; what do you say?39
20.08.2016Should the house be planned by a general contractor or architects?30
11.05.2016Looking for a floor plan for a hillside house12
13.04.2017Opinions on the house floor plan wanted71
16.09.2021Very first floor plan draft of the ground floor267
09.04.2019Single-family house new construction 160 sqm floor plan - Please provide feedback22
01.05.2022Our floor plan design for an affordable house348
17.03.2021Process Architect Floor Plan Phase 1-424
12.08.2021Floor plan conversion of part of a barn into a single-family house with the option for a two-family house33
19.07.2022Floor plan evaluation for a small single-family house 135m²21
26.10.2024Floor plan house with granny flat - improvement suggestions?221
13.09.2022Floor plan of semi-detached house with shed roof and balcony terrace - Feedback49
27.10.2022Floor plan planning single-family house / bungalow - 155 sqm84
12.12.2022Floor plan and elevations for a single-family house of approximately 160 m² on a hillside location74
08.02.2023Floor plan single-family house approx. 180 sqm62
06.03.2023Floor plan 175 sqm gable roof without basement136
01.10.2024Floor plan 3 children's bedrooms single-family house - potentials?43

Oben