Massive house company sought in the Waiblingen/Rems-Murr district area

  • Erstellt am 2020-09-16 18:24:05

Evelyn!

2020-09-18 22:11:46
  • #1
So Werthaus already looks rather high-priced. I would prefer 500,000 including incidental costs. Since I am financing alone, the banks are not so amused even with higher amounts, although I have sufficient equity. The house is manageable in size because I only have a floor area ratio of 0.25. 2.5 floors with basement and granny flat. Exterior dimensions 9.45x8.45m.
 

11ant

2020-09-19 00:42:10
  • #2

Just Schuckhardt, Böpple, and Speidel from your list lead me to several threads in which multiple companies are reviewed in some detail:
https://www.hausbau-forum.de/threads/wir-suchen-einen-massivhaus-anbieter.12852/
https://www.hausbau-forum.de/threads/baufirma-im-grossraum-stuttgart-gesucht.28802/
https://www.hausbau-forum.de/threads/heilbronner-umland-erfahrungen-mit-lokalen-bauunternehmen.29781/
https://www.hausbau-forum.de/threads/massivhaus-gu-pforzheim-enzkreis-bretten-zu-empfehlen.33884/
If you do the same with more names from the list, you will have enough to read until Christmas
 

Ysop***

2020-09-20 11:16:10
  • #3
Werthaus also looks too expensive to me according to the exclusion list and somehow too opaque. I think if the regional options have already been checked and the budget is tight, I would ask the cheaper major providers. What justifies the 100k plus? General price increase? Have you signed anything yet?
 

Malunga

2020-09-20 17:40:12
  • #4
When I google Werthaus, an insolvency proceeding from 2019 appears...
 

Ysop***

2020-09-20 17:53:51
  • #5
That is probably Werthaus Architekten, but as it seems, not the main company. But that is what I meant, among other things, by "opaque".
 

Evelyn!

2020-09-21 13:57:05
  • #6
I haven’t signed anything yet; the nearly 100k increase is justified by general price increases and additional services that I didn't have included before. I partly understand that, but not to this extent. The additional services are, for example, that it will now be built to KfW55 standards and that a "better" heat pump is installed because of Bafa. However, I bear the costs of these services since they were offered as optional in the old offer. Even if I calculate very generously, I might come up with maybe 15,000 € in additional costs. According to the construction company, the price increase is 6%. All good and as expected. ONLY, the house – and the company has recalculated this themselves – is 12% smaller than before. And in my opinion, that should somehow be reflected in the price so that, according to my calculation, I would end up somewhere near the old amount again. 6% more plus additional – 12% less house. Now, with the new dimensions (the area calculation by the architect was wrong), they recalculated and suddenly arrive at 541,000 € instead of 498,000 €, which was the offer at the beginning of August, without anything having changed.. Originally, we were at 450,000 €. He is now offering to stick to the 498,000 instead of charging 541,000. That’s nice, but then I have no basis for negotiation. And how he keeps getting another 50,000 more each time he recalculates is beyond me... I have already had an appointment with Kastell Haus, today with Viva Massivhaus, Friday with another regional construction provider, and I have contacted Viebrockhaus. Now I’m waiting to see if they’ll get their offers ready in time and will meet with the current builder again to see what can still be done. All in all, I liked everything about it, but how these prices came about now seems a bit strange to me.
 

Similar topics
22.01.2010Prefab house vs. solid house - Please urgently need advice!!29
22.04.2010Apartment or house, prefab or solid house?11
30.05.2012Massive house costs KFW 70 - Prefabricated house65
23.05.2013Comparison of solid house versus prefabricated house39
26.12.2012Prefabricated house / solid house, which construction companies?16
26.03.2013Decision-making: Prefabricated house or solid house12
12.08.2014Construction method: Prefabricated house Solid house Construction supervisor Architectural planning18
26.04.2022We are looking for a solid house provider13
28.10.2018Prefabricated House & Solid House - Assessment of Offers23
23.08.2016Solid house/Prefabricated house - Which house should we build?33
03.05.2017Home construction - Solid house or prefabricated house?33
19.06.2017Solid house stone by stone, the ecological wooden house or...19

Oben