kati1337
2020-12-17 09:09:43
- #1
We discussed 3 defects during the acceptance for which we were to be offered financial compensation. Afterwards, an additional point came up. Overall, it concerns:
- [*]a wrongly placed ceiling outlet of the ventilation in the office (directly on the wall instead of further in the room) :confused: [*]a window sill that was not installed [*]a bricked-up corner in the storage room (about 20x20cm) which was not in the plans :mad: [*]We received different stair posts than we had ordered