Hello everyone,

we are facing the decision of whether to get an insect protection sliding door for our PSK terrace door directly from the builder (for 975 euros) or to have the installation done afterwards. Corresponding kits will probably be found online for less money, but would there be any advantage if the builder installs it? He would only mount it on the outside of the frame or in front of the roller shutter box anyway?
 

Tolentino

2021-07-27 21:36:28
  • #2
Warranty, if he somehow breaks the window. Would do it myself.
 

Tarnari

2021-07-27 22:17:52
  • #3
Above all, did you have the opportunity to look at and try out the manufacturer’s solutions? We initially wanted to order all windows/doors/sliding doors including insect screens. The quality was so bad. Everything jammed and could not be moved smoothly. We decided against it and had a regional company install them afterwards. From our parents-in-law, we knew what to expect because they had a screen installed by the same company. It was the right decision. We now have two sliding pleated blinds, whose stops can be moved to the right and left as we currently need. Standard terrace door, 1mx2.30m plus sliding door element, 1.60mx2.30m for €1,700 gross.
 

Oetzberger

2021-07-27 22:26:31
  • #4
Have a proper insect screen (e.g., Neher) installed afterwards by a specialist company. Then you will at least get something high-quality.
 

driver55

2021-07-27 23:25:09
  • #5
Find out the brand/model, then you can still decide. It should have been visible during the sampling.
 

apokolok

2021-07-28 11:18:45
  • #6
With sliding doors, it’s usually only a matter of days before someone runs into them for the first time. Although it is the clean solution, I would still prefer to use a seasonal hanging solution (lamella curtain made of fly screen, for example).
 

Similar topics
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
23.06.2014Developer charges heavily for replanning - justified?12
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
01.03.2015The developer does not build according to the plan14
15.04.2015Duplex construction: Joint or separate developer?20
20.04.2015Decision: Double-wing terrace door, post or mullion?12
24.07.2018Terrace door: Swing door, lift-slide door, or parallel sliding-tilt door?16
13.06.2015New construction with developer / construction drawing documents23
16.03.2016Single-family house - developer rejected25
12.05.2016Individual bathroom planning despite the developer (and saving money...)14
17.05.2016House Building Prices: Architect vs. Developer10
10.09.2016Construction financing and contract with the developer24
02.12.2016Plots in Cologne only through developers?54
01.11.2016Property developers in NRW. Can anyone recommend good property developers?10
21.06.2022Terrace door is not the same as a window, right?21
07.03.2023Floating sliding door flush with the wall? Alternatives?11
11.04.2023Sliding door with soundproofing: What options/providers are available?13

Oben