I have an offer for a new build in NRW. I would be interested in your opinion on the price and also an estimate of where it makes sense to perform work yourself relative to the effort involved.

Key data: prefabricated house, KfW40, 2 full floors, pitched roof DN 30°.

Costs:
370k including base slab, finishing stage see below.

Own work (only labor, materials are provided):
Sanitary installation approx. 3k
Interior ceiling construction (cover all ceilings and attic with drywall, fill EG/OG with mineral wool) approx. 10k
Wall and floor tiles 10k
Interior doors 1k
Painting 9k
Floor coverings 6k

We have included photovoltaics with 20k, double carport with shed 14k (material only here).

Total sum therefore 400k.
 

nordanney

2024-09-14 08:15:41
  • #2
How do you arrive at that total? What is your question? Have all the upcoming special requests already been taken into account? Additional construction costs?
 

JoschNeubau24

2024-09-14 08:20:04
  • #3
The personal contribution is already included in the price. So in the basic house costs + photovoltaics + carport. I just noticed the calculation error. 370+20+14 are 404k€. We have estimated additional construction costs at about 45k. The plot is developed and level.
 

nordanney

2024-09-14 10:59:37
  • #4
So 370k + own contribution.

With what qualities? Special requests?

For a low-budget shell construction house (probably from a known provider) a fitting price.


No. No bargain. If I tell you I buy a car for 25k that is 4.75m long, would you also say it’s a bargain? Maybe it’s a HongFeng without power steering, with manual window regulators, and a crash test rating of 6.
 

JoschNeubau24

2024-09-14 11:07:18
  • #5


404k€ + own labor (material is provided).

Provider is local. Wall structure is OSB, drywall, insulation (cellulose), wood fiberboard (as ETICS).

The roof is also insulated, although the attic is not developed and only a pull-down staircase is planned.

Interior walls OSB+drywall.

Otherwise staircase made of beech. Tiles and floor covering max 30€/sqm included.

We could freely choose the floor plan. Ground floor with living-dining-kitchen + guest room and guest shower. Upper floor 3 rooms + bathroom.
 

Gerddieter

2024-09-14 11:17:16
  • #6


I still think it’s an amazing offer!
 

Similar topics
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
13.03.2014Additional construction costs and realistic additional construction costs?21
11.10.2022List of incidental construction costs. More expensive "on the builder's side"?154
14.01.2016Own contribution - what did you do and would you do it again?79
03.12.2015Own effort - What can be sold well at the bank?64
22.05.2017New build bungalow - air-water heat pump, photovoltaic and solar thermal?17
01.10.2019OSB board on paving stones in carport11
09.01.2020Which empty conduit is suitable for photovoltaics13
13.10.2020Land available - ancillary construction costs, ancillary house costs, financing?34
10.12.2020Assessment of Additional Construction Costs - Have I considered everything?34
10.02.2021New carport: 2x heavy current, dimension empty conduit for photovoltaics?10
24.02.2022Photovoltaic system air-water heat pump - profitability single-family house KFW55EE95
15.02.2022Financing outdoor facilities, carport, equipment32
02.06.2022Promotion of photovoltaic systems Easter package108
29.06.2022Floor plan 120 m², single-family house 1.5, carport. Opinions, ideas, suggestions42
05.03.2023Photovoltaic system on carport without feed-in15
22.03.2024Should photovoltaic design be considered with the heat pump or not?20
22.01.2024Garage carport combo as wooden construction with sandwich panels11
17.12.2024Is a house including ancillary construction costs feasible for 380K EUR?28

Oben