Sir_Kermit
2016-07-30 18:40:52
- #1
Hi,
upgrade from today:
Yesterday the site plan etc. arrived. The documents will go to Denmark at the beginning of next week so that they can also take a look at our ideas there.
The floor plan has been refined a bit, the site plan no longer has anything in common with my scribbles.
One more note on the site plan: we are not yet sure how we will heat. The heat demand calculation etc. still needs to be done. In any case, we are leaning more towards an air-to-water heat pump than towards a condensing boiler plus solar thermal system. The red star would be a possible installation location for the air-to-water heat pump in our view.
Kermit

upgrade from today:
Yesterday the site plan etc. arrived. The documents will go to Denmark at the beginning of next week so that they can also take a look at our ideas there.
The floor plan has been refined a bit, the site plan no longer has anything in common with my scribbles.
One more note on the site plan: we are not yet sure how we will heat. The heat demand calculation etc. still needs to be done. In any case, we are leaning more towards an air-to-water heat pump than towards a condensing boiler plus solar thermal system. The red star would be a possible installation location for the air-to-water heat pump in our view.
Kermit