With us, the soil survey was also included in the scope of services of the general contractor (GU). The result was a foundation recommendation with an additional 60cm of soil replacement. I raised concerns, and during the excavation, the soil surveyor came back again, and the 60cm was reduced to 30cm of soil replacement. Of course, we had to pay for that because otherwise, the GU would not have built a foundation slab. The neighbors were able to pour a foundation slab without a foundation recommendation and soil replacement.